Key takeaways

  • A lime plaster repair beside a doorway is governed by drying and carbonation, not by the clock. This guide sets out a realistic sequence to the final coat.

As an Amazon Associate I earn from qualifying purchases. This post may contain affiliate links at no extra cost to you.

A doorway is a busy place, and a hollow patch of lime plaster beside it is a repair that everyone in the house will notice, which is why the first question is always how long it will take. how long does it take to repair hollow lime plaster around a loose patch near a doorway is best answered honestly: the practical work is a matter of days, but the repair as a whole is a matter of weeks, because lime hardens slowly and each coat must firm before the next goes on. Anyone who promises the job in a single day is either planning to use the wrong material or planning to lay coats that will fail.

The time is set by the chemistry of lime, not by the clock on the wall. A hydraulic lime gains strength as it reacts with water, and a lime putty hardens as it takes in carbon dioxide from the air, at a rate of about 1 to 1.5 mm per month. Those processes cannot be hurried without weakening the result, and the waiting between coats is part of the repair, not a delay in it. A doorway patch that is given its full time will last for decades; a patch that is rushed will sound hollow again within a year, and the time saved will be spent twice over in doing the job again.

This guide sets out a realistic sequence for a doorway patch, from the first tap survey to the final coat of limewash, with the waiting time for each stage spelled out. It covers the survey and the cutting back, the coats and the drying, the finish and the wash, and the small delays that a lived-in house always adds. The aim is not to make the job sound long, but to make it sound true, so the room can be planned around the work instead of the work being squeezed into a gap it cannot fit.

Tools and materials

The materials for a doorway patch are few, and they are chosen to suit a repair that must be built up in thin layers and finished to blend with the old wall. The six items below cover the work from the first coarse coat to the final brushed finish, and each one is listed with the drying figure from its maker, because those figures are what set the timetable. Keep the materials beside the doorway before work starts, so no coat is delayed by a missing bag or a dry sponge.

5 Star Finishes Grassello Di Calce Coarse

  • CL90 microfiltered lime with 2.5 micron ultra-fine marble powder and 20 mesh graded marble grains
  • 20 kg covers about 80 to 120 square feet with two coats
  • Minimum two coats; apply over a sound, keyed background
  • At least 12 hours dry time between coats

5 Star Finishes Grassello Di Calce Coarse is a CL90 microfiltered lime mixed with 2.5 micron ultra-fine marble powder and 20 mesh graded marble grains, and that coarse grain is what makes it the right grade for the first coats of a repair rather than the last. A 20 kg bag covers about 80 to 120 square feet with two coats, and the maker asks for a minimum of two coats, with at least 12 hours of drying between them. The coarse grains give the coat a strong key and a little body, so it can fill the small hollows and tool marks left by cutting back without slumping. Laid in two steady passes it makes a sound bed for a finer finish above.

Marmorino Depot Grassello

  • Lime paste, colouring earths, marble powder, vegetable additives
  • 20 kg covers 250 sq ft with 3 coats
  • 2 or 3 coats

Marmorino Depot Grassello is a ready to use lime paste made from lime, colouring earths, marble powder and vegetable additives, and it is a practical choice for a small repair where mixing a site mortar would waste more than it saves. A 20 kg tub covers about 250 square feet with three coats, so a single tub goes a long way on patch work, and the paste can be laid in two or three coats depending on the depth of the repair. Because the material is already slaked and matured, it spreads smoothly and holds a clean edge beside a door frame. It suits a finish coat over a sound body coat, and it takes limewash well once it has had time to harden.

Valpaint Rococò Grassello di Calce

  • Natural lime putty; semi gloss antique effect
  • Coverage 3 to 4 sq m per litre in two coats
  • Primer 1200 then two coats; 1, 4 and 12 litre tins

Valpaint Rococò Grassello di Calce is a natural lime putty finish that gives a semi gloss antique effect, and it is a good match for the soft sheen that old lime plaster often carries beside a doorway. The maker gives a coverage of 3 to 4 square metres per litre across two coats, laid over Primer 1200, and supplies it in 1, 4 and 12 litre tins, so a small patch can be finished from a single litre tin. The putty base keeps the coat breathable, and the antique effect comes from the way the trowel closes the surface rather than from any coating on top. For a repair that must blend with an old wall, that gentle sheen is often closer to the original than a flat modern finish.

Romabio BioMarmorino Flat

  • Classic fine aggregate plaster, flat finish
  • Grain size 0.04 mm; first coat dry 8 to 12 hours
  • Successive coats 1 to 4 hours between coats
  • Set to burnish 1 to 3 hours

Romabio BioMarmorino Flat is a classic fine aggregate plaster with a flat finish, and its very fine 0.04 mm grain makes it a good final coat where the wall asks for a quiet, matte surface rather than a shine. The first coat dries in 8 to 12 hours, later coats follow 1 to 4 hours apart, and the surface is ready to burnish 1 to 3 hours after laying on. That short burnish window rewards a steady hand and a clean trowel, and the result is a dense, even coat that sits calmly beside old plaster. On a doorway patch the flat finish is forgiving, because it does not throw raking light across small uneven spots the way a gloss finish would.

Color Atelier Lime Slurry

  • Natural mineral-based finish with fine tactile grain and matte finish
  • 5 gallon 32 pound size covers about 150 to 200 square feet in one coat
  • Supplied as a dry mineral mixture to be combined with clean water
  • Applied by brush, roller or trowel

Color Atelier Lime Slurry is a natural mineral based finish with a fine tactile grain and a matte finish, supplied as a dry mineral mixture to be combined with clean water. A 5 gallon, 32 pound size covers about 150 to 200 square feet in one coat, and it can be applied by brush, roller or trowel, which gives a repairer room to match the tool to the patch. Brushed on, it leaves a soft, hand worked texture that suits old lime walls; troweled on, it closes to a denser surface. Because it is a dry mix, the working life is set by the batch size, so mix only as much as the patch needs and keep the water clean and cool.

Natural sea sponge

Natural sea sponge
  • Soft natural sponge for dampening and blending plaster
  • Used with clean water to soften trowel marks and edges
  • Rinse often so grit does not scratch the finish

A natural sea sponge is the simplest tool for finishing lime, and it earns its place by doing what a trowel cannot: it damps the surface evenly, softens the edge of a patch and blends the new coat into the old without leaving a hard line. Used barely damp and worked in light circles, it lifts trowel marks and brings the surface to a close, suede-like texture that takes limewash evenly. The sponge must be rinsed often in clean water, because a single grain of grit caught in the pores will drag a scratch across a finish coat that took an hour to lay on. Keep one sponge for clean water and a second for the first pass over dusty edges, and let both dry fully between working days so they stay sweet.

Item Key spec Best for
5 Star Finishes Grassello Coarse CL90 lime; 20 kg covers 80 to 120 sq ft in two coats First coats that need body and key
Marmorino Depot Grassello Lime paste; 20 kg covers 250 sq ft in 3 coats Finish coat on a small doorway patch
Valpaint Rococò Grassello Natural putty; 3 to 4 sq m per litre in two coats Finish with a soft antique sheen
Romabio BioMarmorino Flat Fine grain 0.04 mm; first coat dry 8 to 12 hours Matte finish that hides small uneven spots
Color Atelier Lime Slurry Dry mineral mix; 150 to 200 sq ft per coat Brushed finish that suits old lime walls
Natural sea sponge Soft sponge for blending and dampening Feathering the patch edge into the old wall

Step by step

Step 1: Survey the patch and plan the visits

The first day of the job is a survey day, and it should not be hurried. Tap the wall with the knuckles in a steady grid, mark the hollow with a pencil and measure the marked area in both directions, noting the depth by probing the edge with a thin blade. While the wall is being mapped, check the door frame for movement, look for damp or salt on the surface and note whether the room must stay in use while the work goes on. A doorway that is used every day will need the work planned around it, with the patch protected and the dust controlled, and that planning is part of the time the job takes.

From the survey, work out the visits the job will need. A small patch needs at least four visits spread over two to three weeks: one to cut back and prepare, one to lay the dubbing and body coats, one to lay the finish coat, and one or more to limewash, with each coat of wash laid one day apart. Write the visits down and agree them with the household, because a lime repair that is interrupted halfway through a coat will dry out and fail. A plan made on the survey day is the best defence against a job that drags on for months because no one agreed when the next visit would happen.

Step 2: Cut back and prepare the background

The first working visit is the cutting back, and it usually takes half a day for a patch beside a doorway. Cut the loose plaster away to the pencil line with a sharp bolster, working from the centre outward, and clear the opening down to the brick or lath, brushing out all the dust and raking the joints back a little. Protect the floor and the door frame with sheeting before the first cut, because the dust from a lime patch will travel further than expected, and clean the room thoroughly before leaving. The wall should be left clean, damp and ready, with the edges of the sound plaster firm and slightly ragged.

Dampen the background well at the end of the first visit, and leave the wall to settle overnight. A thirsty brick wall will drink the first dampening quickly, and a second dampening the next morning will bring the surface to an even moisture before the first coat goes on. If the wall is damp from a leak or from high ground water, the work must wait until the cause is dealt with and the wall has dried to a steady state, and that wait can be weeks rather than days. The preparation visit sets the quality of everything that follows, and it should never be rushed to save half a day.

Step 3: Dub out the deep spots and let them firm

The dubbing coat fills the deepest part of the hollow, and it is laid in thin layers rather than in one mass, with each layer scratched to key the next. A dubbing coat of 10 mm may need two layers, and each layer needs a day to firm before the next goes on, so a deep patch will take two or three days at this stage alone. Mix the coarse grassello with water to a stiff mortar, press it firmly into the joints and build the depth gradually, keeping the surface damp with a light mist between layers. The work itself is quick; the waiting is what takes the time, and the waiting is what makes the coat strong.

While the dubbing coat firms, keep the doorway closed as much as possible, because a draught will dry the surface while the inside is still soft and open fine cracks. Mist the surface lightly if the room is warm, and check the coat each day by pressing it gently with a thumb: it should feel firm and cool, not soft or crumbly. A dubbing coat that is still soft must be left alone, however tempting it is to press on, because a body coat laid over a soft dubbing coat will sink and crack. Patience at this stage is the whole repair, and a day spent waiting is never wasted.

Step 4: Lay the body coat and wait for it to gain strength

The body coat is laid once the dubbing coat has firmed, and it is the coat that brings the patch to level with the surrounding plaster. Lay it on in a single even pass, press it well into the scratched surface below and scratch it in turn with a devil float, so the finish coat has a key to hold on to. The work of laying the coat takes an hour or two for a doorway patch, but the coat then needs several days to gain strength before the finish goes on, and that wait depends on the thickness, the temperature and the dampness of the room. A body coat of 10 mm in a cool room may need a week, while the same coat in a warm, dry room may be ready in four or five days.

During the wait, keep the patch damp with a light mist and keep the door closed, because a body coat that dries too fast will shrink and crack, while a coat kept damp will harden evenly. Check the coat each day: it should grow firmer and lighter in colour as it dries, and the surface should feel hard under a fingernail before the finish is laid. If the coat is still soft or dark in patches, it is still drying, and the finish must wait. The calendar at this stage is set by the wall, not by the diary, and a coat that is given its full time will hold a finish for decades.

Step 5: Lay the finish coat and let it carbonate

The finish coat is the thinnest coat and the slowest to harden, because a lime putty finish carbonates at about 1 to 1.5 mm per month, hardening from the surface inward as carbon dioxide reaches it. Lay the finish on in a thin, even pass, close it with the trowel and blend the edge into the old plaster with a barely damp sea sponge, working in light circles until no hard line remains. The work of laying the coat takes an hour or two, but the coat then needs weeks to harden properly before it can take limewash, and the surface should be firm under a fingernail and even in colour before the wash goes on.

While the finish hardens, protect it from knocks, because a doorway patch is in the path of hands, coats and furniture, and a soft finish will dent easily. A sheet hung over the doorway will keep the patch safe and slow the draught at the same time, and a note on the sheet will stop a well meaning helper from leaning on the fresh coat. Mist the surface lightly in warm weather, and let the room stay at a steady temperature, because frost will damage a fresh lime coat and direct heat will dry it too fast. The finish coat is the face of the repair, and the time spent letting it harden is what makes it last.

Step 6: Limewash one coat per day until the patch blends

Limewash is laid one coat per day, and that rule sets the last stage of the timetable. Each coat must have a day to carbonate before the next goes on, because a coat laid too soon will pull the one below it away from the wall and prevent it from hardening properly. A patch that needs four coats of wash will therefore take four days of short visits, and each visit is a brief one: stir the wash well, brush it on in thin, even strokes, keep a wet edge and leave the wall to dry. The work of each coat takes less than an hour for a doorway patch, but the four days cannot be compressed into one, and anyone who tries will pay for it in a wash that peels.

Feather each coat a little further out from the patch than the last, so the new wash blends into the old wash around it, and stand back in raking light after each coat to check the blend. The patch will look different from the old wall for the first coats, and that is normal: the wash builds depth coat by coat, and the colour settles as the coats carbonate. When the last coat is dry, look at the wall as a visitor would, from the doorway and across the room. A repair that has been given its full time will be hard to find, and that is the best measure of the job.

Common mistakes

Rushing the coats to meet a deadline

The most common mistake in a doorway repair is trying to fit the whole job into a single weekend, because lime will not be hurried. A body coat laid over a soft dubbing coat will sink and crack, a finish coat laid over a soft body coat will not bond, and a limewash laid over a soft finish will peel. Each coat needs its own time, and the time is set by the thickness, the temperature and the dampness of the room. A repair that is given its full time will last for decades, while a repair that is rushed to meet a deadline will be done again within a year, and the second repair will take longer than the first.

Drying the patch with direct heat

A heater aimed at a fresh lime coat will dry the surface while the inside is still soft, and the surface will craze and crack as the inside shrinks. Lime needs moisture to harden, and a coat that is dried too fast will never gain its full strength. Keep the room at a steady temperature, mist the surface lightly in warm weather and let the coat harden in its own time. If the room is cold, wait for warmer weather rather than forcing the drying with heat, because a coat laid in a cold snap and dried with a heater is a coat that will fail.

Working in frost or near freezing

Lime laid in frost will not set, and a fresh coat caught by frost will crumble and fall away. The working range for lime is above 5 degrees, and the coat needs to stay above freezing for days after it is laid, not only on the day of the work. A doorway patch is at risk, because the door opens to the cold and the draught can drop the temperature of the wall below freezing overnight. Check the forecast, keep the door closed, and if frost is expected, wait for a milder spell. A week spent waiting is far cheaper than a coat laid in frost and lost.

Limewashing before the finish has hardened

A putty finish coat carbonates at about 1 to 1.5 mm per month, and a wash laid on too soon will sit on the surface instead of bonding into it. The wash will rub off at the lightest touch, and the brush marks will show for years. Wait until the surface is firm under a fingernail, dry to the touch and even in colour, and then lay the wash in thin coats, one per day. The wait is the hardest part of the job, because the patch looks finished long before it is, but a wash laid on a properly hardened coat will bond into the surface and last for years.

Leaving the patch unprotected beside a busy door

A doorway patch is in the path of hands, coats, bags and furniture, and a soft finish coat will dent and scuff before it has had time to harden. Hang a sheet over the doorway, put a note on it and keep the traffic to the other side of the room while the coats are fresh. The protection costs nothing and takes minutes to put up, while a dent in a fresh finish coat means cutting the patch back and starting the finish again. A repair that is protected while it hardens will last far longer than one that is left to fend for itself in a busy doorway.

FAQ

How long will the whole repair take from start to finish?

A small doorway patch will take two to three weeks from the first survey to the last coat of limewash, and a larger or deeper patch will take longer. The practical work is a matter of days, spread across four or more visits, but the waiting between coats is what sets the calendar: a day or two for the dubbing coat to firm, several days for the body coat to gain strength, weeks for the finish coat to carbonate, and a day per coat of limewash. A patch that is given its full time will last for decades, while a patch that is rushed will need doing again within a year. Plan the room around the calendar, and the job will run smoothly.

Can the repair be hurried with a heater or a fan?

No, and trying will weaken the repair. A heater dries the surface while the inside is still soft, which opens fine cracks and stops the coat from gaining strength, while a fan does the same by moving dry air across a fresh coat. Lime hardens by taking in carbon dioxide and by reacting with water, and both processes need moisture and time. Keep the room at a steady temperature, mist the surface lightly in warm weather and let the coat harden in its own time. If the room is cold, wait for warmer weather rather than forcing the work with heat.

When can the room be used normally again?

The room can be used carefully once the finish coat is laid, provided the patch is protected from knocks and the traffic is kept to the other side of the doorway. The patch should not be touched, leaned on or cleaned until the finish has hardened, which takes weeks, and the limewash should not be washed or scrubbed for longer still. Furniture can go back once the coats are firm, but a chair pushed against a soft patch will dent it, so keep the furniture clear of the wall until the finish is hard. A sheet hung over the doorway is a simple way to remind everyone that the wall is still curing.

How do I know when a coat is ready for the next one?

The test is simple and needs no instrument: press the coat gently with a thumb and scratch it lightly with a fingernail. A coat that is ready will feel firm and cool, will not dent under the thumb and will take only a faint mark from the nail. A coat that is still soft will dent easily and feel damp, and a coat that is still dark in patches is still drying. The surface should also be even in colour across the patch, because a coat that is patchy in colour is patchy in dryness too. When in doubt, wait another day: a day spent waiting is never wasted, while a coat laid too soon must be cut out and done again.

Does winter change the timetable?

Yes, and it can add weeks to the job. Lime should not be laid below 5 degrees, and a fresh coat must stay above freezing for days after it is laid, so a cold snap can stop the work entirely. A doorway is at particular risk, because the door opens to the cold and the draught can chill the wall overnight. In winter, the room must be kept at a steady temperature, the door kept closed and the forecast watched, and the drying will be slower even in a heated room, because the air holds less moisture. A repair planned for spring or autumn will run faster than one planned for the coldest weeks of the year.

Conclusion

A hollow lime plaster repair beside a doorway takes weeks, not days, and the time is set by the lime itself rather than by the diary. Sound the wall and plan the visits, cut back to firm plaster, build the depth in thin layers, give each coat its full time to firm and carbonate, and limewash one coat per day until the patch blends into the wall. The practical work is a matter of days spread across several visits, but the waiting is what makes the repair last, and a patch that is given its full time will breathe with the wall, move with the door frame and settle into the room until it is hard to find. Plan the room around the calendar, protect the fresh coats, and let the lime do its slow work.

A
admin88
We compare specs, warranty terms, long-term owner feedback and street pricing before anything earns a spot. Rankings are never paid.
Affiliate disclosure. As an Amazon Associate we earn from qualifying purchases at no extra cost to you. Prices accurate as of the date shown.
How Long Hollow Lime Plaster Repair by a…Check price on Amazon

Related guides

Browse all How-to, sửa lỗi & học tập guides →

More from Amazon

Programs that pair well with the guide above. Offers and eligibility are set by Amazon and may change.

Amazon Prime

Free shipping on eligible items, Prime Video and more. Eligible new members can start with a free trial.

Start a Prime free trial
Audible

Audiobooks and podcasts to listen to on the go. Eligible new members can start with a free trial.

Try Audible free
Amazon Music Unlimited

Ad-free music streaming. Eligible new subscribers can start with a free trial.

Try Music Unlimited free
Amazon Business

A free business account with business pricing and bulk-buying tools for work, shop or home office.

Create a business account

As an Amazon Associate we earn from qualifying purchases.

Handpicked for this guide

More ways to save on your next finish

Programs that pair well with the guide above. Offers and eligibility are set by Amazon and may change.

Most popular
🏢
Amazon Business
Free to sign up

A free business account with business pricing and bulk-buying tools for work, shop or home office.

Create a business account
🚚
Amazon Prime
Free trial for new members

Fast, free shipping on eligible items, plus Prime Video and more. Eligible new members can start with a free trial.

Start a Prime free trial
📖
Kindle Unlimited
Free trial for new members

Read from a huge library of eBooks, including how-to guides and cookbooks. Eligible new members can start with a free trial.

Try Kindle Unlimited
🎧
Audible
Free trial for new members

Audiobooks and podcasts for the commute, the garage or the kitchen. Eligible new members can start with a free trial.

Try Audible free

As an Amazon Associate we earn from qualifying purchases. Using these links costs you nothing extra.