An outdoor stone outbuilding is one of the hardest surfaces to prepare for lime render, because the stone has spent years in the weather, the joints hold dust and moss, and the wall faces wind and rain from every side. A render laid on a surface that was not prepared will look fine for a season and then lift along the joints, crack over the stones and come away in patches, and the repair will cost far more than the preparation would have. how to prepare the surface before you apply lime render around an outdoor stone outbuilding is a question about patience, because the wall must be clean, sound, damp and steady before the first coat goes on.
The first job is to read the building. Walk around it in daylight and look at the stone faces, the joints, the plinth and the corners, and note where the mortar has fallen away, where the stone is soft or laminated, and where water runs down the wall. An outbuilding wall is rarely one stone: a wall may hold hard sandstone, soft limestone, brick repairs and concrete patches all within a few square feet, and each of those surfaces drinks water at a different rate. Check the ground around the building too, because a wall that stands in wet soil will draw damp up from below, and no amount of surface preparation will fix a wall that is wet from the ground.
This guide works through the preparation in the order you should do it, from cleaning and raking out the joints to damping, priming and checking the suction, so the render has a sound, even surface to bond to. Each entry gives the verified facts that matter for planning, and the steps show how the work fits together on a real building. Take your time, work in dry weather, and do not rush the drying between stages.
Tools and materials
Saint-Astier NHL 2
- 100 percent pure natural hydraulic lime NHL 2
- 25 kg bags; initial set about four days
- Mixing water about 15 litres per 25 kg bag
- Ideal for soft substrates and traditional masonry
Saint-Astier NHL 2 is the lead material for this job because it is a soft, gentle hydraulic lime that suits the soft stone of an old outbuilding, where a stronger lime would be too hard and would damage the stone faces. Its initial set of about four days gives you a long working time on a large wall, and the mixing water of about 15 litres per 25 kg bag gives a soft, workable mortar that presses easily into raked joints. On a stone outbuilding it is the right lime for the pointing and the dubbing out that comes before the render, because it sets slowly, moves with the stone and stays vapour open. Mix it with clean water only, keep the mix the same for every batch, and do not add extra water once the mortar has started to firm up in the bucket.
Mike Wye Lime Putty Plaster
- Lime putty plaster for internal lath wood wool board stone and brick
- Hair fibre and various sized sands can be added
- Built up in layers with scratch and float coats
Mike Wye Lime Putty Plaster is the plaster for dubbing out the hollows in a stone outbuilding wall, and it matters because a stone wall is never flat, and the render needs a level base to sit on. A lime putty plaster that can take hair fibre and sands of different sizes lets you build up the deep hollows in layers, a scratch coat first and a float coat over it, until the wall reads true enough for the render. Use it to fill the dips between stones and to level the wall where the old render has fallen away, and let each layer firm up before the next goes on. A dubbing out coat that is still soft will show through the render as a dark patch, so patience here saves a second coat later. Keep the plaster covered and damp while you work, and knock it up well before use so it is smooth and free of lumps.
Washed sharp sand
- Clean well-graded sharp sand
- Typical base coat ratio 1 part lime to 2.5 to 3 parts sharp sand by volume
Washed sharp sand is the aggregate that gives a lime render its body and its grip, and the quality of the sand decides the quality of the render. A clean, well graded sharp sand, free of clay and salt, mixes with lime into a mortar that trowels on smoothly, keys into the stone and dries to a firm, open coat. The typical base coat ratio of 1 part lime to 2.5 to 3 parts sharp sand by volume is a sound starting point for a render over stone, and you can tune the ratio to the suction of the wall and the weather on the day. Wash the sand if it is dusty, and store it under cover so it stays clean and dry. A sand with clay in it will hold water in the render and slow the set, while a sand with salt in it will bring white marks to the surface as the render dries.
Devil float
- Float with nails or teeth used to scratch a key into a green base coat
- Scratches should be shallow and even
A devil float is the tool that cuts a key into a green base coat so the next coat has something to grip, and on a stone outbuilding it is used on every coat that will be covered by another. The nails or teeth on the face of the float score shallow, even lines across the fresh render, and those lines give the next coat a mechanical grip that no amount of trowel work can match. Use it once the coat has firmed up enough to hold its shape but is still damp enough to take a scratch, and keep the scratches shallow and even, because deep cuts will show through the finish. Work the float in one direction across the wall, then check the key with a fingertip and scratch again where the surface is still smooth. A well keyed coat will take the next layer without a visible line.
5 Star Finishes Quartz Primer
- Quartz primer; diluted 1 to 1 with water over new drywall to seal and consolidate
- Second layer undiluted or with 30 percent dilution
- Allow primers to dry for at least 1 hour
5 Star Finishes Quartz Primer is the primer for this job where the stone outbuilding has left a wall with patchy suction, some stones drinking fast and others hardly at all. A coat of quartz primer steadies the suction so the render goes on at one rate across the whole wall, and its fine quartz grains give the dusty surface of old stone something firm to grip. Brush it on evenly over the areas where the old work is worn thin, every new putty repair, and every patch of bare stone, and let it dry for at least 1 hour before any render goes on. A primer coat that is still tacky will grab the trowel and leave drag marks, while a dry primer gives the render a steady, even suction across the wall. Where the whole wall is powdery, prime the full surface rather than spot priming, because spot priming alone will leave a map of the repairs showing through the finish.
Fassa Bortolo Calce Idraulica Naturale NHL 3.5
- Natural hydraulic lime to EN 459-1, class NHL 3.5
- Compressive strength at least 3.5 N per square mm at 28 days
- Setting begins about 5 hours; free lime above 25 per cent
- 25 kg moisture-protected bags
Fassa Bortolo Calce Idraulica Naturale NHL 3.5 earns its place as the lime for the render coats on the more exposed faces of the outbuilding, where the wall needs a firmer set than a soft NHL 2 lime can give. Its strength of at least 3.5 N per square mm at 28 days gives the render a firm finish that will stand up to wind and rain, while the setting time of about 5 hours gives you a workable day on the wall. The free lime above 25 per cent keeps the render vapour open, which is what an old stone wall needs. Mix each 25 kg bag with clean water as the maker directs, keep the bags dry in storage, and lay the coat on in even passes so the render sits flat across the whole surface. Do not use this lime on very soft stone without checking first, because a firm render on a soft stone can damage the stone faces.
| Item | Key spec | Best for |
|---|---|---|
| Saint-Astier NHL 2 | 100 percent NHL 2; initial set about four days | Soft stone pointing and dubbing out |
| Mike Wye Lime Putty Plaster | Lime putty plaster; built up in layers | Levelling hollows in stone walls |
| Washed sharp sand | Clean sharp sand; 1 to 2.5 to 3 ratio | Body and grip in base coat mixes |
| Devil float | Nails or teeth; shallow even scratches | Keying green coats for the next layer |
| 5 Star Finishes Quartz Primer | Dilute 1 to 1; dry at least 1 hour | Steadying patchy suction on stone |
| Fassa Bortolo Calce Idraulica Naturale NHL 3.5 | NHL 3.5; strength at least 3.5 N per sq mm | Firmer render on exposed faces |
Step by step
Step 1: Clean the wall and clear the joints
Brush the whole wall down with a stiff brush to take off loose dust, moss, lichen and flaking mortar, working from the top down so the dirt falls clear of the cleaned work. Wash the wall with clean water and a brush, and let it dry before you look at it again, because a wet wall hides the faults. Rake out the loose and hollow joints with a joint raker or a hooked tool, cutting back to sound mortar and leaving a square, even joint that the new pointing can grip. Take the loose material away in a barrow and keep the ground clear, because a tidy site makes the rest of the work faster and safer. Do not use a pressure washer on soft stone, because the jet will cut the stone faces and open the joints wider than they need to be.
Step 2: Cut back the weak areas and check the stone
Walk the wall in raking light and mark every soft stone, hollow patch and failed repair with a pencil. Tap the stone faces with a knuckle and listen for a hollow note that shows the stone has delaminated or the old render has lost its bond. Cut the loose material back to a firm edge with a hammer and chisel, and brush the dust away so the new work meets a clean surface. Check the corners and the plinth with extra care, because those are the places where water sits and where the stone fails first. This check decides the whole job: a wall that passes it can be pointed and dubbed out, while a wall that fails it needs stone repairs before any render goes on.
Step 3: Point the joints with soft lime mortar
Mix the soft lime mortar from Saint-Astier NHL 2 and washed sharp sand, and press it into the raked joints with a small trowel, working it firmly into the depth of the joint rather than skimming over the top. Fill the joints in two thin passes rather than one deep one, and smooth the surface with a damp brush so the pointing sits flush with the stone faces. Leave the pointing to firm up and carbonate before any render goes on, because a joint that is still soft will show through the render as a dark line. Small joints usually need a day, and deeper ones need longer, so plan the pointing day before the dubbing out day. Keep the pointing damp in hot weather so it does not dry out before it has set.
Step 4: Dub out the hollows with lime putty plaster
Mix the lime putty plaster and press it into the hollows between the stones with a trowel, building the wall up in layers until it reads true enough for the render. Lay on a scratch coat first, key it with the devil float while it is still green, and let it firm up before the float coat goes on. Use a straight edge to check the plane as you work, and dub out again where the light shows a hollow. A dubbing out coat that is still soft will show through the render as a dark patch, so let each layer firm up in its own time. Keep the work damp in hot weather, and protect it from rain and frost while it sets.
Step 5: Prime the patchy areas and check the suction
Brush the quartz primer over every area where the stone drinks fast, every new pointing repair, and every patch of bare stone, working it evenly with a brush and keeping a wet edge. Where the whole wall is powdery, brush the primer over the full surface rather than spot priming, because spot priming alone will leave a map of the repairs showing through the finish. Let the primer dry for at least 1 hour before any render goes on. Then drip clean water on several spots and watch how it behaves. Sound stone darkens and drinks the water in within a minute or two. A surface that beads, or one that stays pale and dry, has lost its absorbency and needs more preparation before the render goes on.
Step 6: Dampen the wall and mix the render
Mist the wall lightly with clean water until the surface darkens evenly, then wait until the shine leaves the face. A wall that is too dry will suck the water out of the fresh render in minutes and leave a powdery coat, while a wall that is wet will dilute the render and leave it weak. Mix the render from the NHL 3.5 lime and washed sharp sand, stirring thoroughly and scraping the bottom of the container, and keep stirring at intervals while you work, because the lime settles quickly and an unstirred bucket gives a thin coat at the top and a thick one at the bottom. Use the same water ratio for every batch so the colour and the strength stay even from the first section to the last.
Step 7: Lay on the base coat, key it and let it firm up
Load the trowel and press the base coat firmly onto the dampened wall, working it into the joints and the hollows of the stone so it keys into the surface rather than lying on top of it. Work from a corner across the wall in planned sections, keeping a wet edge at all times, and do not go back over a section that has started to firm up. Lay the coat on at an even thickness, and scratch a key into the surface with the devil float while it is still green, so the next coat has something to grip. Once the coat has firmed up, float it with a wooden float in broad sweeps until the surface reads flat. Leave the coat alone after floating and let it firm up in its own time. Lime render needs days, not hours, between coats, and more in cold or damp weather. Protect the fresh work from rain, frost and strong sun for several days while it carbonates.
Common mistakes
Washing soft stone with a pressure washer
A pressure washer looks fast, but the jet cuts soft stone faces, opens the joints wider than they need to be, and drives water deep into the wall where it will sit for weeks. Always clean a stone outbuilding with a stiff brush and clean water, and let the wall dry before you judge it. The extra hour spent brushing is far cheaper than the stone repairs a pressure washer will cause.
Pointing the joints with a hard cement mortar
A cement mortar is too hard for old stone, and it will trap water behind the joints, push salts to the surface and damage the stone faces as the wall moves. Always point a stone outbuilding with a soft lime mortar that matches the stone, and let the joints carbonate before the render goes on. The lime mortar will move with the wall and stay vapour open for years.
Dubbing out in one thick layer
A thick dubbing out coat looks fast, but it shrinks as it dries and cracks into a fine map of lines across the surface, and it will pull away from the stone as it shrinks. Build the hollows up in thin layers, key each layer with the devil float, and let each layer firm up before the next goes on. Two thin layers will always outlast one thick one on a stone wall.
Priming only the spots you can see
Spot priming leaves a map of the repairs showing through the finish, because the primed spots drink slowly and the unprimed spots drink fast, and the render dries at two different rates. Where the whole wall is powdery, prime the full surface, and where the suction is patchy, prime every area that drinks fast. A full coat of primer is cheaper than a failed render.
Rendering over a wall that is too dry
A wall that is too dry will suck the water out of the fresh render in minutes and leave a powdery coat that has no bond to the stone. Always mist the wall lightly before the render goes on, and wait until the shine leaves the face. A damp wall gives the render time to bond, while a dry wall takes the water before the lime can set.
Skipping the key between coats
A base coat that is left smooth will not hold the next coat, and the finishing coat will come away in sheets. Always scratch a key into every coat that will be covered by another, using the devil float while the coat is still green. The key is quick to cut and it is the only grip the next coat has.
FAQ
Can I render over any stone outbuilding wall?
Only over a sound, absorbent stone wall. The stone must be firmly bonded, free of loose flakes, and able to absorb a drip of water within a minute or two. Stone that is powdery, laminated, sealed or contaminated needs cutting back and a bonding primer first, and a render over old cement paint or a resin coating will not bond at all without a suitable primer system.
How do I know if the joints need raking out?
Press a screwdriver into the joints and tap the wall with a knuckle. If the mortar crumbles under the screwdriver, or the wall sounds hollow, the joints need raking out to sound mortar. If the mortar is firm and the wall sounds solid, a light brush down and a fresh pointing may be enough.
How long should I wait between the pointing and the render?
Allow at least a day for the pointing to firm up, and longer in cold or damp weather. Lime mortar firms up slowly as it carbonates, so the joints must be firm before you can dub out or render over them, and a render laid over soft pointing will drag and crack. One stage per drying period is the safe rule for most walls.
Why does the stone wall need damping before the render?
Stone drinks water fast, and a dry wall will suck the water out of the fresh render before the lime can bond. Damping the wall lightly gives the render time to key into the stone and the joints, and it keeps the coat workable while you trowel it on. Mist the wall until it darkens evenly, then wait until the shine leaves the face.
Can I use a steel trowel instead of a wooden float for lime render?
A wooden float is the better tool for floating a lime render coat, because the wooden face closes the surface without polishing it shut and leaves the coat open enough to take the next layer. A steel trowel can lay the render on, and it can work for a final polish on a very flat wall, but it will seal the surface too early and leave a harder, less lively finish.
What should I do about a hard line where the new render stops?
Feather the edge while the render is still workable, using a damp sponge in light circular motions to soften the line where the new coat meets the old work. If the line has already dried, let the coat dry fully, then soften the edge with a damp sponge and touch it in with a thin coat, blending outward so the repair fades into the old work.
Conclusion
Preparing a stone outbuilding for lime render is a job of patience rather than speed. The wall must be cleaned without a pressure washer, the joints raked out and pointed with a soft lime mortar, the hollows dubbed out in thin layers, and the patchy suction steadied with a primer, before the first coat of render goes on. Saint-Astier NHL 2 leads the work for its gentle set on soft stone, with Mike Wye putty plaster and Fassa NHL 3.5 lime as strong partners where the wall needs levelling or a firmer finish, and washed sharp sand to give every mix its body. Check the wall with water and tape, prime where it is weak, dampen before you render, and let each stage dry in its own time. Done this way, the render will bond to the stone, read as part of the old building, and stay vapour open and sound for years.
Related guides
More ways to save on your next finish
Programs that pair well with the guide above. Offers and eligibility are set by Amazon and may change.
A free business account with business pricing and bulk-buying tools for work, shop or home office.
Create a business accountFast, free shipping on eligible items, plus Prime Video and more. Eligible new members can start with a free trial.
Start a Prime free trialRead from a huge library of eBooks, including how-to guides and cookbooks. Eligible new members can start with a free trial.
Try Kindle UnlimitedAudiobooks and podcasts for the commute, the garage or the kitchen. Eligible new members can start with a free trial.
Try Audible freeAs an Amazon Associate we earn from qualifying purchases. Using these links costs you nothing extra.
Write Your Review
No reviews yet. Be the first to share your experience!