Key takeaways
- The cost of lime stucco on a repaired heritage facade depends on area, coats and access. This guide explains each factor in words, with quantities and coverage.
As an Amazon Associate I earn from qualifying purchases. This post may contain affiliate links at no extra cost to you.
A repaired heritage facade is the most expensive kind of lime stucco work to price, because the wall has already been repaired and the render has to match the repair, the original stone, and the listed character of the building. How much does it cost to apply lime based stucco on a repaired heritage facade is therefore a question with several answers, and the honest one starts by counting what the job actually uses: the area of the facade, the number of coats, the bags of render, the days of labour, the access, and the curing time. None of those items has a single fixed value, because a facade with deep repairs takes far more material than a flat wall of the same area, and a facade that needs a scaffold takes far more time than one reached from the ground.
This guide explains the cost of the job in words, without money figures, by working through the quantities that drive it. The comparison table shows what each material contributes and what it covers, so a reader can see where the bulk of the job sits. The step by step section walks through measuring the facade, counting the coats, working out the bags, and allowing for labour and access. The common mistakes section flags the pricing errors that catch people out on heritage work, where the repair and the render are often priced as if they were one simple job.
Quick answer
The cost of lime stucco on a repaired heritage facade depends on the area, the thickness of the coats, the number of bags, and the time the work takes. A two coat system on a facade uses about 25 kg of pre-blended render per square metre for a 15 mm base coat, and about 8 kg per square metre for a 5 mm finish coat, so a facade of 50 square metres needs roughly 50 bags of base render and 16 bags of finish render, plus a margin for the rough stone and the repairs. The labour runs to several days for the preparation, the rendering, and the damp curing, with extra time for the scaffold, the protection, and the slow drying that lime needs. A facade with deep repairs takes more material and more time than a flat wall, because every repair has to be dubbed out and left to firm before the render goes on. The cheapest way to control the cost is to measure carefully, order the right bags, and keep the work damp and protected so no coat has to be redone.
| Material | What it does | When to use it |
|---|---|---|
| St. Astier Ecomortar Base | Pre-blended NHL 3.5 base render | Base coat on a repaired heritage facade |
| St. Astier Ecomortar Finish | Pre-blended NHL 3.5 finish render | Thin finish coat over the base |
| RC Kalei lime render | Fine NHL 3.5 render for thin layers | Finish and repair layers on a facade |
| Graded limestone aggregate 0 to 1 mm | Fine aggregate for finish mixes | Finish coat and gauging mixes |
| Hozelock Spraymist Trigger Sprayer 4121 | One litre sprayer for dampening and curing | Mist coats and hessian during curing |
| Marshalltown M38 Fine Cell Rubber Float | Fine cell rubber float, 9 by 4 in | Floating the finish coat to a close face |
Step by step
1. Measure the facade in square metres
Measure each face of the facade in square metres, working from a scaffold or a long tape, and write the area down face by face. Deduct the full area of windows and doors, but add back a margin for the reveals and the sills, because the render wraps into every opening and the reveals take as much material as a flat face. Measure the height of the wall from the plinth to the eaves, and note where the facade steps in or out, because a stepped facade has more edge work than a flat one. A facade measured from the ground always comes out short, so measure from the scaffold or from a drawing where one exists, and check the drawing against the wall before ordering.
2. Count the coats and their thickness
A repaired heritage facade usually needs a base coat and a finish coat, with dubbing coats where the repairs are deep. The base coat runs 15 mm thick on a flat face and up to 30 mm where the wall is rough or the repairs are deep, and the finish coat runs 3 to 5 mm over the top. Count the dubbing separately, because a deep repair takes a full extra coat of material that a flat wall never needs. Write the thickness of each coat next to the area of each face, because the material count follows directly from those two numbers, and a coat counted at the wrong thickness throws the whole order out.
3. Work out the bags from the coverage figures
Use the coverage figures on the data sheets to turn the area and thickness into bags. A pre-blended base render covers about one square metre per 25 kg bag at 15 mm, so a facade of 50 square metres at 15 mm needs about 50 bags of base render. A finish render covers about three square metres per 25 kg bag at 5 mm, so the same facade needs about 16 bags of finish render. A fine render for thin repair layers covers 2 to 6 kg per square metre for two layers of 2 to 4 mm, so a repair area of 10 square metres needs 20 to 60 kg of that render. Add ten percent to every figure for a rough stone face, and add a bag or two for the sample panels and the patching that always follows the main work.
4. Allow for preparation and repair time
The preparation takes as long as the rendering on a repaired facade. Stripping old coatings, raking joints, rebedding loose stone, and dubbing out deep repairs takes a day or two on a small facade and a week on a large one, and the dubbing needs days to firm before the render goes on. The rendering itself takes a day per coat on a facade of 50 square metres, with a day between coats for the first coat to firm, and the curing takes at least five days per coat under damp hessian. A scaffold takes half a day to put up and half a day to take down, and the protection for the curing needs checking every morning and evening. Count all of those days, not just the days with a trowel in hand, because the curing days are working days even when no render goes on.
5. Allow for access and protection
A facade above the ground floor needs a scaffold, and the scaffold needs a base, a tie into the wall, and a debris net to keep the render off the street. The scaffold hire runs for the whole job, including the curing days, because the protection has to stay up until the last coat has hardened. Ground floor work needs a simple tower or a step ladder, and the protection is a sheet over the work and a board over the ground. Allow time to move the scaffold along the facade, because a scaffold that has to be struck and rebuilt for each face costs far more in time than one that walks along the wall.
6. Order the materials in the right sequence
Order the base render and the aggregate first, because the dubbing and the base coat use them, and order the finish render and the limewash later, because they sit in the store while the base coat hardens. Order the sand in two grades, coarse for the base and fine for the finish, and keep both covered and dry. Order the sprayer, the float, and the hessian with the first delivery, because the curing starts the day the first coat goes on. A delivery that arrives late holds up the whole job, and a delivery that arrives early sits in the weather, so time each delivery to the coat that needs it.
7. Keep a record of what the job used
Keep a simple record of every bag opened, every day worked, and every coat laid, with the area covered by each batch. The record shows where the material went, and it makes the next facade easier to price, because the figures are real instead of guessed. A record also shows when a coat used more material than the coverage figure allowed, which usually means the wall was rougher than measured or the coat went on thicker than planned. Photograph each face before, during, and after the work, and keep the photographs with the record, because a heritage facade is often inspected years later and the record is the only proof of what was done.
Tools and materials
St. Astier Ecomortar Base
- Pre-blended NHL 3.5 base render, 25 kg bags
- Base sand grading 2.5 mm
- Coverage about 1 square metre per bag at 15 mm
- Total system 20 to 30 mm; base coat curing 4 to 7 days
St. Astier Ecomortar Base is a pre-blended NHL 3.5 base render for the first coat on a repaired heritage facade. The maker data sheet lists 25 kg bags, a base sand grading of 2.5 mm, a coverage of about one square metre per bag at 15 mm, a total system thickness of 20 to 30 mm, and a base coat curing time of four to seven days. Those figures make the bag count easy to work out: a facade of 50 square metres at 15 mm needs about 50 bags, and a rougher wall needs more. The pre-blended mix also keeps the ratio constant from bag to bag, which matters on a heritage facade where a patchy mix would show in the finish.
Pros: Pre-blended ratio stays constant, documented coverage, good base for a finish coat.
Cons: Bag count grows fast on a rough wall, and the base needs days to cure before the finish.
St. Astier Ecomortar Finish
- Pre-blended NHL 3.5 finish render, 25 kg bags
- Finish sand grading 1.3 mm
- Coverage about 3 square metres per bag at 5 mm
- Finish coat 5 to 8 mm; consumption 1.8 kg per square metre per mm
St. Astier Ecomortar Finish is a pre-blended NHL 3.5 finish render for the thin coat over the base. The maker data sheet lists 25 kg bags, a finish sand grading of 1.3 mm, a coverage of about three square metres per bag at 5 mm, a finish coat of 5 to 8 mm, and a consumption of 1.8 kg per square metre per millimetre. A facade of 50 square metres at 5 mm needs about 16 bags, and the fine grading gives a close face that a sponge float can finish without dragging. The finish render is the coat that shows, so the grading and the consumption figures matter more here than in the base.
Pros: Fine grading for a close finish, documented coverage, consistent colour from bag to bag.
Cons: Thin coats only, needs a sound base below, and the bag count is easy to undercount.
RC Kalei lime render
- NHL 3.5 render based on St Astier lime
- 25 kg bags; grain 0.05 to 0.63 mm
- Consumption about 2 to 6 kg per square metre for two layers of 2 to 4 mm
- About 20 square metres per day by hand
RC Kalei is a fine NHL 3.5 lime render for thin layers and repair work on a facade. The maker data sheet lists 25 kg bags, a grain size of 0.05 to 0.63 mm, a consumption of about 2 to 6 kg per square metre for two layers of 2 to 4 mm, and a working rate of about 20 square metres per day by hand. Those numbers suit the repair layers on a heritage facade, where the render goes on thin over dubbing and old stone, and the fine grain lets the coat close without a heavy float. The render is also useful for the finish on a small facade, where a fine grain gives a smoother face than a coarser render.
Pros: Fine grain for thin layers, documented consumption, good working rate by hand.
Cons: Thin layers only, and the consumption range is wide, so the bag count needs care.
Graded limestone aggregate 0 to 1 mm
- Graded limestone aggregate, 0 to 1 mm
- Pale, fine face for finish mixes
- Finish coat 5 to 8 mm; Ecomortar Finish consumption 1.8 kg per square metre per mm
- Free of clay and oversize stones
Graded limestone aggregate from 0 to 1 mm is the fine aggregate for finish mixes on a heritage facade. The aggregate appears in the Finitura 750 data sheet as a graded limestone aggregate with a pale, fine face, and the finish coat that uses it runs 5 to 8 mm thick, with a consumption of 1.8 kg per square metre per millimetre. The pale colour keeps the finish light, which suits a heritage facade where the render should match the original stone rather than darken it. The aggregate must be free of clay and oversize stones, because a single stone dragged across a finish coat leaves a line that cannot be floated out.
Pros: Pale colour suits heritage work, fine grading gives a close finish, easy to gauge.
Cons: Needs sieving before use, and a dusty delivery weakens the mix.
Hozelock Spraymist Trigger Sprayer 4121
- One litre bottle, adjustable nozzle from jet to mist
- Translucent graduated bottle for measuring water
- Used for dampening and for misting hessian during curing
The Hozelock Spraymist Trigger Sprayer 4121 is a one litre sprayer with an adjustable nozzle that runs from a jet to a fine mist, in a translucent graduated bottle. The sprayer is the tool for dampening a wall before rendering and for misting the hessian during curing, because a fine mist wets the surface without washing the render off. The graduated bottle also lets the worker measure the water for a small batch, which matters when a repair mix needs a precise water ratio. A sprayer is a small item in the cost of a job, but it is the tool that controls the dampness of every coat, and dampness is what makes lime harden well.
Pros: Fine mist control, graduated bottle, cheap and easy to replace.
Cons: One litre is small for a large facade, and the nozzle needs cleaning after lime work.
Marshalltown M38 Fine Cell Rubber Float
- Fine cell rubber float, 9 by 4 in
- Fine cell face for closing a finish coat
- Used with a light circular motion on a firm coat
The Marshalltown M38 is a fine cell rubber float, 9 by 4 inches, for closing the finish coat on a heritage facade. The fine cell face grips the render just enough to close the surface without tearing it, and the 9 by 4 inch size suits a facade where the work runs in sections around windows and repairs. A rubber float is used with a light circular motion on a coat that has firmed but not dried, and the M38 is the fine grade in the range, with a coarser M39 for heavier work. The float is the tool that decides the final texture of the facade, so the grade of the float matters as much as the grade of the sand.
Pros: Fine cell face gives a close finish, good size for section work, durable rubber pad.
Cons: Needs a coat at the right firmness, and the pad wears with use.
Common mistakes
Pricing the facade as if it were flat
A repaired facade is never flat. The repairs, the reveals, the steps, and the rough stone all take more material and more time than a flat wall of the same area. Measure each face separately, add a margin for the rough stone, and count the dubbing as a separate coat. A facade priced as a flat wall always runs short of material and time.
Undercounting the finish render
The finish coat is thin, so it looks cheap, but a facade of 50 square metres at 5 mm still needs about 16 bags of finish render, and a rough base needs more. Order the finish render with the same care as the base, and keep a bag back for patching, because a finish render ordered short leaves the last face waiting while the base coat dries out.
Forgetting the curing days
Lime needs at least five days of damp curing per coat, and those days are working days even when no render goes on. A price that counts only the rendering days leaves the scaffold, the protection, and the labour for the curing days out of the total, and the job runs over. Count the curing days, the scaffold hire for those days, and the morning and evening checks that keep the hessian damp.
Ordering all the material at once
A delivery of 60 bags at the start of a job sits in the weather while the base coat hardens, and lime render stored damp goes off in the bag. Order the base render first and the finish render later, and keep every bag covered and dry. A bag that has gone hard in the store is a bag wasted.
Ignoring the access cost
A facade above the ground floor needs a scaffold, and the scaffold needs a base, ties, and a debris net. The access is often the largest single item after the labour, and a scaffold that has to be struck and rebuilt for each face costs far more than one that walks along the wall. Price the access first, not last, because it decides whether the job is practical at all.
FAQ
How many bags of lime render does a heritage facade need?
A facade of 50 square metres needs about 50 bags of 25 kg base render at 15 mm and about 16 bags of 25 kg finish render at 5 mm, plus ten percent extra for rough stone and repairs. A facade with deep repairs needs more base render, because the dubbing coats use the same material. Work the count out from the coverage figures on the data sheets, not from a guess, and keep a bag back for patching.
Does a repaired facade cost more than a new one?
Yes, because the repairs have to be dubbed out and left to firm before the render goes on, and the render has to match the repair and the original stone. A new wall takes a standard two coat system, while a repaired facade takes dubbing, a base coat, and a finish coat, with extra time for the curing between them. The repair work is a separate job from the rendering, and it should be priced separately.
How long does the work take on a facade?
A facade of 50 square metres takes a day or two for preparation, a day per coat for the rendering, and at least five days of damp curing per coat. The whole job runs to two or three weeks including the scaffold, the protection, and the drying time. A larger facade takes longer in proportion, and a facade in shade takes longer to dry than one in sun.
Can the work be done in winter?
Lime work needs temperatures above 5 degrees C, and the render needs protection from frost for at least a week after each coat. Winter work is possible with a heated scaffold and a longer curing time, but the cost rises because the protection and the heating run for the whole job. Most heritage work is done in spring and autumn, when the temperatures are mild and the drying is slow.
What happens if the render dries too fast?
A coat that dries in a day turns powdery and weak, because the lime never gets the moisture it needs to harden. The coat dusts under a finger and fails within a year, and the only fix is to strip it and start again. Keep the work damp under hessian for at least five days per coat, and check the cover every morning and evening.
Conclusion
The cost of lime stucco on a repaired heritage facade comes down to area, thickness, bags, and days. Measure the facade face by face, work the bag count out from the coverage figures on the data sheets, count the preparation and the curing days as well as the rendering days, and price the access before anything else. The six materials on the list cover the job from the base coat to the finish, and their coverage figures give the quantities without guesswork. A facade priced this way has no surprises in it, and the render that follows will match the repair and the stone for decades.
Related guides
More ways to save on your next finish
Programs that pair well with the guide above. Offers and eligibility are set by Amazon and may change.
A free business account with business pricing and bulk-buying tools for work, shop or home office.
Create a business accountFast, free shipping on eligible items, plus Prime Video and more. Eligible new members can start with a free trial.
Start a Prime free trialRead from a huge library of eBooks, including how-to guides and cookbooks. Eligible new members can start with a free trial.
Try Kindle UnlimitedAudiobooks and podcasts for the commute, the garage or the kitchen. Eligible new members can start with a free trial.
Try Audible freeAs an Amazon Associate we earn from qualifying purchases. Using these links costs you nothing extra.
Write Your Review
No reviews yet. Be the first to share your experience!