An uneven brick wall drinks limewash the way a sponge drinks water, and it does so unevenly. The high bricks take a thin coat, the low joints take a thick one, the old mortar takes more than the brick face, and the patches where the old wash has worn away take the most of all. A quantity worked out for a flat plaster wall will run short on a brick wall, and a wall that runs short halfway through the second coat is a wall that ends up in two colours. how much material do you need to recoat old limewash finishes on an uneven brick wall is therefore a question about measuring the wall properly, reading the surface honestly, and working the quantities out from the coverage rates with a margin for the unevenness.

The method in this guide is simple, and it works for any brick wall. Measure the wall area, count the joints, and allow for the extra material the joints and the low spots take. Work out the limewash from its coverage rate and the number of coats. Work out the repair materials from the area and the depth of the losses. Work out the primer from the area of the thirsty patches. Then add a margin for waste, for the material left in the brush and the bucket, and for the test patches that every job needs. A wall measured this way will not run short, and a wall that does not run short is a wall that finishes in one colour.

This guide works through each material in turn, with the coverage rates and pack sizes you need to work the quantities out for your own wall. It covers the joints, the repairs, the primer and the wash, and it explains where the material goes on an uneven wall so you can see why the margin is needed. Measure first, work the numbers out on paper, and order the whole amount before you open a container.

Tools and materials

5 Star Finishes Grassello Di Calce Medium

  • Medium grain grassello di calce in the CL90 lime and marble powder family
  • Maker notes the most natural stone effects come from the Medium grade
  • Apply in two coats; at least 12 hours between coats

Grassello Di Calce Medium is the lead material for an uneven brick wall because its medium grain suits the scale of brickwork. A fine grassello disappears into the joints and leaves the brick face bare, while a coarse grassello sits proud of the brick and shows as lumps under the wash. The Medium grade fills the joints and the shallow losses without hiding the brick, and the maker notes that the most natural stone effects come from this grade, which is the look an old brick wall wants. Apply it in two coats, with at least 12 hours between coats, so each coat can settle before the next one goes on. Work out the quantity from the area of the losses and the thickness of the coats, and allow extra for the joints, which take more material than the brick face.

Cornish Lime Limewash

  • Pure, non-hydraulic limewash made from high calcium CL90 quicklime
  • Coverage about 4 to 6 square metres per litre
  • Available in 10 litre containers; 24 traditional colours
  • Brush application; one coat per day

Cornish Lime Limewash is the main material by volume on this job, and its coverage rate is the number the whole quantity calculation starts from. Made from high calcium CL90 quicklime with no synthetic binder, it bonds to the old brick and the old mortar by carbonation and stays open to vapour, which is what a brick wall needs if it is to dry out after rain. Its coverage of about 4 to 6 square metres per litre is the rate for a flat plaster wall, so on an uneven brick wall you should work at the low end of the range: the joints, the low bricks and the thirsty mortar all take more wash than a flat surface. A 10 litre container covers 40 to 60 square metres per coat on a flat wall, and less on a brick wall. Work the quantity out for two coats, add a margin for the unevenness, and order the whole amount before you start.

San Marco Grassello di Calce

  • Air-hardening lime binder; specific gravity 1.50 kg per litre
  • Touch dry 3 hours, recoat after 12 hours at 25 C and 65 percent relative humidity
  • Spreading rate 1 to 1.2 kg per square metre in 2 coats
  • Indoor Air Quality A plus; fire class A2 s1 d0

Grassello di Calce is the fine lime binder for the thin skims that even out a brick wall before the wash goes on. Where the old limewash has worn thin and the brick and mortar show through in patches, a thin coat of grassello rebuilds a sound, even mineral surface for the new wash to grip. Its spreading rate of 1 to 1.2 kilograms per square metre in two coats lets you work out the quantity from the wall area, and the 12 hour recoat time at normal room conditions fits a two-day rhythm of skimming followed by recoating. Touch dry in 3 hours means a morning skim can be checked and lightly worked in the afternoon. The high vapour permeability keeps the wall open to moisture movement, which matters on a brick wall that takes in rain and dries out again through the face.

Giorgio Graesan Primus Sabbia

  • Maker primer for Marmorino 2020; consumption 6 to 7 square metres per litre
  • Use before Marmorino 2020; the surface must be well bonded first
  • Maker recommends an insulating fixative first on plasterboard walls
  • Sanded primer that gives lime plaster a grip on smooth supports

Primus Sabbia is the primer for the smooth, hard areas of a brick wall that would otherwise reject the new coat: the glazed brick, the hard cement pointing, the patches of old paint that cannot be stripped. A sanded primer that gives lime plaster a grip on smooth supports, it is used at a consumption of 6 to 7 square metres per litre, which lets you work out the quantity from the area of the smooth patches rather than from the whole wall. The surface must be well bonded first: a primer over a loose surface only seals the looseness in. Use it only where the wall is smooth and hard, and leave the absorbent brick and mortar to take the wash directly. A primer used where it is needed is a small part of the material list; a primer used everywhere is a waste of material and a change in the suction of the whole wall.

Meoded Marmorino Palladino

Meoded Marmorino Palladino
  • Lime plaster with medium-size mineral aggregates
  • Matte stone texture or smooth burnished finish
  • Two coats over Quartz Primer
  • Gallon (5 kg) covers about 25 to 45 sq ft for two coats; quart (1 kg) covers 5 to 9 sq ft

Palladino is the finish plaster for the feature areas of a brick wall: the chimney breast, the alcove, the stretch of wall that faces the room. A lime plaster with medium-size mineral aggregates, it gives a matte stone texture or a smooth burnished finish in two coats over a quartz primer, and its medium grain sits well beside the scale of brickwork. A gallon covers about 25 to 45 square feet for two coats, and a quart covers 5 to 9 square feet, so the small feature areas can be worked out in quarts and the larger ones in gallons. Use it where the wall deserves a closer look, and leave the plain stretches of wall to the wash. A feature finish used everywhere would double the material cost for no visible gain, and a feature finish used nowhere leaves the wall without a focal point.

Marshalltown Venetian Plastering Trowel MXS11SSD

  • Stainless steel blade 11 in by 3-3/4 in
  • Beveled edges and radius corners
  • DuraSoft soft-grip handle; sizes 8-3/8 in and 11 in
  • Made in USA

The MXS11SSD is the trowel that lays the grassello and the finish plaster on an uneven brick wall. Its stainless steel blade, 11 inches by 3 and 3/4 inches, covers ground fast on a large wall, and the beveled edges and radius corners keep it from digging into the soft lime or leaving lines across the fresh coat. The DuraSoft soft-grip handle stays comfortable through long sessions, which matters on a brick wall where the trowel work is heavy and the day is long. The 8 and 3/8 inch size suits the smaller patches and the reveals, and the 11 inch size suits the open stretches of wall. Keep the blade clean and slightly damp, and wipe it often so dried crumbs do not score the fresh plaster. A good trowel is not a material by volume, but it is the tool that decides how much material ends up on the wall and how much ends up on the floor.

Item Key spec Best for
5 Star Finishes Grassello Di Calce Medium Two coats; at least 12 hours between coats Filling joints and shallow losses on brick
Cornish Lime Limewash Coverage 4 to 6 sq m per litre; 10 litre containers The new breathable coat; work at the low end on brick
San Marco Grassello di Calce Spreading 1 to 1.2 kg per sq m in 2 coats Thin skims that even out the wall
Giorgio Graesan Primus Sabbia Consumption 6 to 7 sq m per litre Grip on smooth, hard patches
Meoded Marmorino Palladino Gallon covers 25 to 45 sq ft for two coats Feature areas that face close viewing
Marshalltown MXS11SSD Stainless blade 11 in by 3-3/4 in; radius corners Laying plaster on a large, uneven wall

Step by step

Step 1: Measure the wall and count the joints

Measure the wall in square metres, taking the length times the height and subtracting the doors, windows and fireplaces. Then look at the brickwork and count the joints: a wall of small bricks has far more joint area than a wall of large bricks, and the joints take far more wash than the brick face. Note the depth of the joints and whether the mortar is flush, recessed or proud, because a recessed joint takes more material than a flush one. Note the areas where the old wash has worn away and the bare brick shows, because those areas will drink the new wash fastest. Write the measurements down: the wall area, the joint area, the bare areas and the damaged areas. These four numbers are the basis of the whole quantity calculation.

Step 2: Work out the limewash quantity for two coats

Take the wall area and divide it by the coverage rate, working at the low end of the range on a brick wall: 4 square metres per litre rather than 6. Multiply by two for the two coats. A wall of 30 square metres needs about 15 litres for two coats at the low end of the range, which is two 10 litre containers with a margin left over. Add a further margin for the joints and the bare areas, which take more wash than the brick face, and for the material lost to the brush and the bucket. If the wall is very uneven, with deep joints and large bare patches, work the quantity out at 3 square metres per litre for the first coat and 4 for the second. Order the whole amount before you start, so a half-finished wall never waits for a delivery.

Step 3: Work out the repair materials from the losses

Measure the area of the losses: the chips, the hollows, the places where the mortar has fallen out of the joints. Measure the depth of each loss, and work the volume out from the area times the depth. A loss of 1 square metre at 5 mm deep needs 5 litres of fill, and a loss of the same area at 10 mm deep needs 10 litres. Work the grassello out from its spreading rate of 1 to 1.2 kilograms per square metre in two coats, and the medium grade grassello out from the area of the joints and the shallow losses it will fill. Add a margin for the material that falls off the trowel and the material left in the bucket. Repair materials are a small part of the list by volume, but they are the part that decides whether the finished wall reads as one surface or as a map of patches.

Step 4: Work out the primer from the thirsty and smooth areas

The primer is worked out from the area it will cover, not from the area of the whole wall. Measure the thirsty patches: the bare brick, the repairs, the chalky areas that dust the hand. Measure the smooth patches: the glazed brick, the hard cement pointing, the old paint that cannot be stripped. Work the quartz primer out from its coverage rate and the area of the thirsty patches, and the sanded primer out from its consumption of 6 to 7 square metres per litre and the area of the smooth patches. Do not prime the whole wall: the sound old wash does not need it, and priming the whole wall would change the suction in places where it was already right. A primer used only where it is needed is a small part of the material list.

Step 5: Add the margin for waste and test patches

Add a margin of about a tenth to the limewash quantity and to the repair quantities, for the material left in the brush and the bucket, for the drips and the splashes, and for the test patches. Every job needs test patches: a patch on the wall to check the colour, a patch to check the strength of the wash, a patch to check the bond on a repaired area. Those patches use material, and they are worth the material they use, because a test patch that shows a problem early saves a whole wall coated wrong. Add a further margin if the wall is high or awkward to reach, because material is lost more easily from a ladder than from the ground. A margin that is not needed is a container kept for the next recoat; a margin that is missing is a wall left half finished.

Step 6: Order the materials and check them on arrival

Order the limewash, the grassello, the primer and the finish plaster in the quantities you worked out, and check them when they arrive: the containers should be sealed, the powder should be dry and free of lumps, and the colours should match the order. Store the limewash and the putty under cover and out of frost, and keep the powder dry. Mix a small test batch of the wash and try it on a patch of the wall, and check the colour when it is dry. If the colour is wrong, it is better to find out from a test patch than from a whole wall. Once the test patch is right, the job can start, and the quantities you worked out will carry it through to the end.

Step 7: Lay the coats and keep count of what you use

Lay the first coat on in long, even strokes, working from the top of the wall downward and keeping a wet edge. Keep count of the containers as you use them, and compare the count with the quantity you worked out: if the first coat uses far more than you planned, the wall is thirstier than you read, and the second coat will need more too. If the first coat uses far less, the wall is less thirsty than you read, and you will have material left over. Adjust the second coat to the strength the wall needs, and keep the brush strokes even so the finished wall reads as one colour. A wall coated with the quantities worked out in advance finishes in one colour, because the material was there when the wall needed it.

Common mistakes

Working the quantity out for a flat wall instead of a brick wall

A flat plaster wall takes the wash evenly, and the coverage rate on the tin is written for a flat wall. A brick wall takes more wash in the joints, more in the low spots, and more on the bare mortar, and a quantity worked out at the flat-wall rate will run short. Work the quantity out at the low end of the coverage range on a brick wall, and add a margin for the joints. A container left over is a container kept for the next recoat; a container missing is a wall left half finished.

Forgetting the joints in the measurement

The joints are a large part of a brick wall by area, and they take more material than the brick face. A measurement that counts only the brick face and forgets the joints will understate the quantity by a large margin, especially on a wall of small bricks with deep joints. Count the joints, measure their depth, and allow for the extra material they take. The joints are where the wash goes first and where it shows most when it runs short.

Ordering one coat at a time

A recoat needs at least two coats, and a wall coated from two batches bought a week apart may show a difference in colour. Order the whole amount before you start, from a single batch if you can, so the wall is coated from one supply. A wall coated from a single batch reads as one colour; a wall coated from two batches may not, and the difference will show in the low light of the room.

Skipping the test patch

A test patch costs a little material and a little time, and it answers the questions that matter: is the colour right, is the strength right, does the wash bond to the repaired areas. A job that skips the test patch finds the answers from the whole wall, and the answers found that way are expensive to fix. Lay a test patch on a quiet corner of the wall, let it dry fully, and judge it in daylight before you commit to the whole wall.

Storing the leftover wash badly

Limewash left in an open container will skin over, dry out and go to waste. A container kept for the next recoat should be sealed, kept under cover and out of frost, and the surface of the wash covered with a thin layer of clean water to keep the air off it. A container stored badly is a container thrown away, and a container thrown away is material paid for and never used.

FAQ

How much limewash does a brick wall need per square metre?

Work at the low end of the coverage range on a brick wall: about 4 square metres per litre rather than 6. That means a wall of 30 square metres needs about 7 to 8 litres per coat, or 15 litres for two coats, before the margin for the joints and the bare areas. A wall with deep joints and large bare patches needs more, and a wall of large, smooth bricks needs less. Measure your own wall and work the quantity out from the low end of the range.

Do the joints really take that much more material?

Yes. The joints are recessed below the brick face, so the brush has to reach into them, and the old mortar is usually more absorbent than the brick. On a wall of small bricks the joints can be a quarter of the wall area, and they take twice as much wash per square metre as the brick face. Count the joints in the measurement, and the quantity will follow. A wall whose joints are ignored in the measurement is a wall that runs short.

How much repair material do I need?

Work it out from the area and the depth of the losses: a loss of 1 square metre at 5 mm deep needs 5 litres of fill, and the same area at 10 mm deep needs 10 litres. Work the grassello out from its spreading rate of 1 to 1.2 kilograms per square metre in two coats, and add a margin for the material that falls off the trowel. Small losses need little material; a wall with large areas of failed mortar needs a measurable weight of it.

Can I use the leftover wash for the next recoat?

Yes, if it is stored properly. Seal the container, keep it under cover and out of frost, and cover the surface of the wash with a thin layer of clean water to keep the air off it. Stir it well before use, and test it on a patch before you commit to a wall. A wash stored well will keep for months; a wash stored badly will skin over and go to waste.

What if I run out halfway through the second coat?

Stop at a door frame, a corner or a change of plane, and order the same product in the same colour before you carry on. Do not try to stretch the remaining wash by thinning it further: a thinned coat will show as a pale patch beside the full-strength coat. A wall finished from two batches of the same product will usually read as one colour if the colour and the strength match, but a wall finished with a thinned coat beside a full coat will not.

Conclusion

The material for recoating an uneven brick wall follows from the measurement, not from a guess. Measure the wall area, count the joints, measure the losses and their depth, and work each material out from its coverage rate: the limewash at the low end of its range, the grassello from its spreading rate, the primer from the area of the patches it will cover. Add a margin for waste and for the test patches, and order the whole amount before you start.

The materials in this guide are all mineral and all open to vapour, which is what a brick wall needs if it is to dry out after rain. The medium grain grassello fills the joints without hiding the brick, the fine grassello evens the thin areas, the sanded primer gives the smooth patches a grip, and the limewash gives the wall its new breathable coat. Done this way, an uneven brick wall is not a problem to be covered up: it is a wall whose joints and bricks have been given the material they need, and the finished wall reads as one even surface, in one colour, from one batch. The next recoat will find a sound wall waiting, and the quantities for that recoat will be smaller, because the wall will be in better shape than it is today.

A
admin88
We compare specs, warranty terms, long-term owner feedback and street pricing before anything earns a spot. Rankings are never paid.
Affiliate disclosure. As an Amazon Associate we earn from qualifying purchases at no extra cost to you. Prices accurate as of the date shown.
Material Quantities for Recoating Uneven Brick WallsCheck price on Amazon

Related guides

Browse all How-to, sửa lỗi & học tập guides →

More from Amazon

Programs that pair well with the guide above. Offers and eligibility are set by Amazon and may change.

Amazon Prime

Free shipping on eligible items, Prime Video and more. Eligible new members can start with a free trial.

Start a Prime free trial
Audible

Audiobooks and podcasts to listen to on the go. Eligible new members can start with a free trial.

Try Audible free
Amazon Music Unlimited

Ad-free music streaming. Eligible new subscribers can start with a free trial.

Try Music Unlimited free
Amazon Business

A free business account with business pricing and bulk-buying tools for work, shop or home office.

Create a business account

As an Amazon Associate we earn from qualifying purchases.

Handpicked for this guide

More ways to save on your next finish

Programs that pair well with the guide above. Offers and eligibility are set by Amazon and may change.

Most popular
🏢
Amazon Business
Free to sign up

A free business account with business pricing and bulk-buying tools for work, shop or home office.

Create a business account
🚚
Amazon Prime
Free trial for new members

Fast, free shipping on eligible items, plus Prime Video and more. Eligible new members can start with a free trial.

Start a Prime free trial
📖
Kindle Unlimited
Free trial for new members

Read from a huge library of eBooks, including how-to guides and cookbooks. Eligible new members can start with a free trial.

Try Kindle Unlimited
🎧
Audible
Free trial for new members

Audiobooks and podcasts for the commute, the garage or the kitchen. Eligible new members can start with a free trial.

Try Audible free

As an Amazon Associate we earn from qualifying purchases. Using these links costs you nothing extra.