Key takeaways
- Work out the lime render quantities for traditional exterior brick walls, from wall area and coat thickness to bags, sand, water and the waste stages leave.
As an Amazon Associate I earn from qualifying purchases. This post may contain affiliate links at no extra cost to you.
A traditional exterior brick wall looks simple to measure, because the bricks are regular and the wall is flat, but the amount of lime render it needs is decided by the coats, the thickness and the condition of the brick, not by the area alone. A wall that is sound and flat needs two coats and a small amount of material, while a wall with deep joints, soft brick and a poor base needs pointing, dubbing out and three coats, and the material grows with every extra stage. how much material do you need to apply lime render on traditional exterior brick walls is a question about counting, because a clear count of the material will let you order once and work without stopping.
The first thing to work out is the area of the wall. Measure the length and the height of every face that will be rendered, and take off the area of any doors, windows and large openings, because the render only goes where the wall is. A brick wall is often longer than it looks, and a wall that runs around a whole house can add up to a large area even when it is only one storey high. Write the area down in square metres and keep it beside you while you plan, because every material in this guide is sold by the bag, and the number of bags you need follows directly from the area and the thickness of the coats.
This guide works through the quantities in the order they hit the job, from the wall area and the coat thickness to the bags, the sand, the water and the waste each stage leaves. Each entry gives the verified facts that matter for planning, and the steps show how the work fits together on a real wall. There are no money figures here, because the price of lime moves with the place and the season, but the quantities are the same everywhere, and a clear count will let you work out the order for your own wall.
Tools and materials
Adaptavate Breathaplasta Smooth
- Fine lime-based finishing plaster for a super smooth final surface
- Applied as the skim finish to a lime plaster system
- 20 kg bags; no Portland cement, gypsum or synthetics
Adaptavate Breathaplasta Smooth is the lead material for this job because it is a fine lime-based finishing plaster that gives a super smooth final surface on a traditional exterior brick wall. Its 20 kg bag is easy to handle on a scaffold, and the absence of Portland cement, gypsum and synthetics means the finish stays vapour open, which is what an old brick wall needs. Applied as the skim finish to a lime plaster system, it goes on in a thin, even coat over the floated base coat, and it dries to a soft, even face that reads well on a traditional wall. Count the bags from the wall area and the skim thickness, and keep the finish bags separate from the base coat bags so they are not mixed up on site. A finish laid too thick will crack as it dries, while a thin, well laid finish will dry to a smooth face that takes a limewash well.
Mike Wye Lime Plaster 2/1
- Traditional premixed lime plaster from selected sands and mature lime putty, matured for several weeks
- Ratio 2 parts sand to 1 part mature lime putty by volume
- For final coat internal skimming
Mike Wye Lime Plaster 2/1 is the plaster for the final coat on a traditional brick wall, and it matters because the ratio of 2 parts sand to 1 part mature lime putty by volume gives a mix that is easy to work out and easy to repeat from batch to batch. A traditional premixed lime plaster from selected sands and mature lime putty, matured for several weeks, gives a smooth, workable mix that trowels on evenly and dries to a firm, open coat. Use it for the final coat where the wall needs a smooth face, and keep the ratio the same for every batch so the colour and the strength stay even from the first section to the last. Count the material from the wall area and the coat thickness, and mix it with clean water only, because dirty water will stain the finish and slow the set.
Ty-Mawr TopLime Hemp Plaster
- High calcium lime blended with fine hemp shiv
- Base coats up to 15 mm
- Coverage 2.5 square metres at 6 mm per 20 kg bag
- Supplied ready to use
Ty-Mawr TopLime Hemp Plaster is the base coat material for this job, and it matters because a high calcium lime blended with fine hemp shiv gives the base coat a light, open body that moves with the brick and dries evenly. Its coverage of 2.5 square metres at 6 mm per 20 kg bag gives a simple way to work out how much to order, and the base coat depth of up to 15 mm lets you level a wall that is uneven without laying on a coat that is too thick. Supplied ready to use, it saves the mixing time on site and keeps every batch the same. Lay it on in even passes, key it while it is still green, and let it firm up before the next coat goes on. Count the bags from the wall area and the base coat thickness, and add a spare bag for the waste that always comes with trowel work.
Lime Green Natural Finish
- Coloured topcoat finish for use over Lime Green Duro base coat, applied at 5 mm
- Colours include Chalk, Birch, Bath, Cotswold and York
Lime Green Natural Finish is the coloured topcoat for this job where the brick wall needs a finish with a soft, natural colour that reads well on a traditional house. Applied at 5 mm over a Lime Green Duro base coat, it gives a firm, even face in a choice of colours that include Chalk, Birch, Bath, Cotswold and York, so the finish can be matched to the brick and the garden around it. Lay it on in even passes to a steady 5 mm, and let it firm up before floating, because a finish laid too thick will crack as it dries. Count the material from the wall area and the 5 mm thickness, and order the colour in one batch so the shade is the same across the whole wall. Keep the finish bags dry in storage, and mix with clean water only so the colour stays true.
Washed sharp sand
- Clean well-graded sharp sand
- Typical base coat ratio 1 part lime to 2.5 to 3 parts sharp sand by volume
Washed sharp sand is the aggregate that gives a lime render its body and its grip, and the quality of the sand decides the quality of the render. A clean, well graded sharp sand, free of clay and salt, mixes with lime into a mortar that trowels on smoothly, keys into the brick and dries to a firm, open coat. The typical base coat ratio of 1 part lime to 2.5 to 3 parts sharp sand by volume is a sound starting point for a render over brick, and you can tune the ratio to the suction of the wall and the weather on the day. Work out the sand from the volume of the render mix, and order it by the tonne or the bulk bag so the site stays tidy. Wash the sand if it is dusty, and store it under cover so it stays clean and dry. A sand with clay in it will hold water in the render and slow the set, while a sand with salt in it will bring white marks to the surface as the render dries.
Kerakoll Biocalce Intonaco
- WTA-certified plaster based on NHL 3.5 natural hydraulic lime
- Consumption about 1.3 kg per square metre per mm
- 25 kg bags; mixing about 5.1 litres per 25 kg bag
Kerakoll Biocalce Intonaco earns its place as the plaster for the body coats on a traditional exterior brick wall, where the render needs a firm, certified base that will stand up to the weather. Its consumption of about 1.3 kg per square metre per mm of thickness gives a simple way to work out how much to order, and the 25 kg bag with a mixing water of about 5.1 litres per bag keeps every batch the same. The WTA certification shows the plaster has been checked for use on damp masonry, which is what an old brick wall needs. Lay it on in even passes to the thickness the wall needs, key it while it is still green, and let it firm up before the next coat goes on. Count the bags from the wall area and the coat thickness, and keep the bags dry in storage so the lime stays fresh.
| Item | Key spec | Best for |
|---|---|---|
| Adaptavate Breathaplasta Smooth | 20 kg bags; skim finish; no cement | Smooth skim finish on brick walls |
| Mike Wye Lime Plaster 2/1 | Ratio 2 sand to 1 putty by volume | Final coat skimming |
| Ty-Mawr TopLime Hemp Plaster | 20 kg covers 2.5 sq m at 6 mm | Light base coats up to 15 mm |
| Lime Green Natural Finish | Coloured topcoat at 5 mm; five colours | Coloured finish over Duro base |
| Washed sharp sand | 1 lime to 2.5 to 3 sand by volume | Body and grip in base coats |
| Kerakoll Biocalce Intonaco | About 1.3 kg per sq m per mm | Certified body coats on brick |
Step by step
Step 1: Measure the wall and work out the area
Measure the length and the height of every face that will be rendered, and write the figures down in a notebook. Take off the area of any doors, windows and large openings, because the render only goes where the wall is. Add the faces together to get the total area in square metres, and keep the figure beside you while you plan, because every material in this guide is sold by the bag, and the number of bags you need follows directly from the area and the thickness of the coats. A brick wall is often longer than it looks, so measure twice and add a small allowance for waste, because a shortfall in the middle of a coat will cost more in time than a spare bag costs in material.
Step 2: Check the brick and count the repairs
Walk the wall in raking light and mark every loose joint, hollow patch and soft brick with a pencil. Tap the brick faces with a knuckle and listen for a hollow note that shows the old render or mortar has lost its bond. Count the repairs you will need to make, and note how deep they are, because a wall with many deep repairs needs more lime putty and more labour than a wall that is sound. Drip water on several spots and note which areas darken and absorb and which stay pale. This check decides the quantity of material: a sound wall needs two coats and a small amount of material, while a wall with many repairs needs pointing, dubbing out and three coats, and the material grows with every extra stage.
Step 3: Work out the coats and the quantities
Decide how many coats the wall needs, and work out the material for each coat from the wall area and the coverage figures in the table above. A base coat of Ty-Mawr TopLime Hemp Plaster at 6 mm thick needs about one 20 kg bag for every 2.5 square metres, while a body coat of Kerakoll Biocalce Intonaco needs about 1.3 kg per square metre for every mm of thickness. Work out the sand from the volume of the render mix, using the ratio of 1 part lime to 2.5 to 3 parts sharp sand by volume, and the water from the mixing figures for each bag. Write the quantities down coat by coat, and add a spare bag for the waste that always comes with trowel work. A clear count of the material will let you order once and work without stopping.
Step 4: Order the material and set up the site
Order the material coat by coat, and keep the bags for each coat in separate stacks so they are not mixed up on site. Store the lime bags under cover and off the ground, because damp lime will set in the bag and be wasted. Set up the scaffold or the trestles so the whole wall can be reached without moving the scaffold in the middle of a coat, and keep the water, the sand and the tools close to the wall so the mixing does not slow the trowelling. A tidy site saves more time than any other single step, and a site with the material in the wrong place will stall the work between batches.
Step 5: Dampen the wall and mix the render
Mist the wall lightly with clean water until the surface darkens evenly, then wait until the shine leaves the face. A wall that is too dry will suck the water out of the fresh render in minutes and leave a powdery coat, while a wall that is wet will dilute the render and leave it weak. Mix the render thoroughly, scraping the bottom of the container, and keep stirring at intervals while you work, because the lime settles quickly and an unstirred bucket gives a thin coat at the top and a thick one at the bottom. Use the same water ratio for every batch so the colour and the strength stay even from the first section to the last. If the render needs hair, add it now and mix it in well so the strands spread evenly through the batch.
Step 6: Lay on the base and body coats and key them
Load the trowel and press the base coat firmly onto the dampened wall, working it into the joints and the hollows of the brick so it keys into the surface rather than lying on top of it. Work from a corner across the wall in planned sections, keeping a wet edge at all times, and do not go back over a section that has started to firm up. Lay the coat on at an even thickness, and scratch a key into the surface while it is still green, so the next coat has something to grip. Once the coat has firmed up, float it with a wooden float in broad sweeps until the surface reads flat. Leave the coat alone after floating and let it firm up in its own time. Lime render needs days, not hours, between coats, and more in cold or damp weather.
Step 7: Apply the finishing coat and check the quantities
Dampen the wall lightly again, then lay on the finishing coat in the same even passes, working a little faster and looser than the base coat. Keep the pressure light and let the trowel do the work, and do not overload the trowel near the edges of the work. Where the new work meets an area of old brick that is not being rendered, feather the edge with a damp sponge so the line disappears instead of drying as a hard ridge. Float the finishing coat once it has firmed up, closing the surface to a soft, even finish. As you work, keep a note of how much material each section used, and compare it with the count you made in Step 3. If a section used more than the count, the coat was too thick, and the next section should be laid thinner. Step back often and look at the wall as a whole, because a render succeeds when the wall reads as one surface.
Common mistakes
Ordering material from a guess instead of a measure
A guess at the wall area will always be wrong, and a shortfall in the middle of a coat will cost more in time than a spare bag costs in material. Always measure the wall, take off the openings, and work out the quantities coat by coat from the coverage figures. A clear count will let you order once and work without stopping.
Counting only the render and forgetting the sand and water
The render bags are only part of the order, and a job that forgets the sand and the water will stall on the first morning. Always count the sand from the mix ratio, the water from the mixing figures, and the hair from the volume of the base coat mix. A full count of every material will let the work run without a trip to the merchant in the middle of a coat.
Laying the finishing coat too soon
A finishing coat laid over a base coat that is still soft will drag, lift and crack, and the two coats will dry as one uneven layer instead of two even ones. Lime render needs days between coats, and more in cold or damp weather. Wait until the base coat is firm to the touch and pale in colour before starting the finish.
Working the render after it has started to firm up
Lime render sets slowly, but going back over a half firm section with a loaded trowel lifts the render and leaves a pale scar that no amount of later work will hide. Plan the sections before you start, keep a wet edge, and leave each section alone once it is done. If a section goes wrong, let it dry fully and correct it with the next coat.
Using a coat that is too thick
A thick coat of lime render looks generous in the bucket and generous on the wall, but it shrinks as it dries and cracks into a fine map of lines across the surface. Thin coats bond better, dry more evenly, and build to a stronger finish. Two thin coats will always outlast one thick one on an old wall.
Mixing the finish bags with the base coat bags
A finish bag mixed into a base coat will waste a good finish and weaken the base coat, and a base coat bag mixed into a finish will spoil the colour and the texture. Always keep the bags for each coat in separate stacks, label the stacks, and check the bag before you open it. A tidy store is part of the job.
FAQ
How do I work out how much render I need?
Measure the wall area in square metres, decide the coat thickness, and divide the area by the coverage figure for the material. A base coat of Ty-Mawr TopLime Hemp Plaster at 6 mm thick needs about one 20 kg bag for every 2.5 square metres, while a body coat of Kerakoll Biocalce Intonaco needs about 1.3 kg per square metre for every mm of thickness. Add a spare bag for waste.
How much sand do I need for a lime render?
Work out the sand from the volume of the render mix, using the ratio of 1 part lime to 2.5 to 3 parts sharp sand by volume. A wall of 20 square metres with a base coat 10 mm thick needs about 0.2 cubic metres of render, and the sand is about two thirds of that volume. Order the sand by the tonne or the bulk bag so the site stays tidy.
How much water does a lime render mix need?
Use the mixing figure for the material. A 25 kg bag of Kerakoll Biocalce Intonaco needs about 5.1 litres of clean water, while a 25 kg bag of Lime Green Solo needs 5 to 7 litres. Keep the water ratio the same for every batch so the colour and the strength stay even from the first section to the last.
How long should I wait between coats of lime render?
Allow several days between coats, and longer in cold or damp weather. Lime render firms up slowly as it carbonates, so the base coat must be firm before you can judge its plane and coverage, and a finishing coat laid over a soft base coat will drag and crack. One coat per drying period is the safe rule for most walls.
Can I use one thick coat instead of two thin ones?
No. A thick coat shrinks as it dries and cracks into a fine map of lines across the surface, and it will pull away from the wall as it shrinks. Two thin coats bond better, dry more evenly, and build to a stronger finish. The saving from one coat is lost many times over when the thick coat fails and has to be stripped.
What should I do about a hard line where the new render stops?
Feather the edge while the render is still workable, using a damp sponge in light circular motions to soften the line where the new coat meets the old work. If the line has already dried, let the coat dry fully, then soften the edge with a damp sponge and touch it in with a thin coat, blending outward so the repair fades into the old work.
Conclusion
The amount of lime render a traditional exterior brick wall needs follows from the area, the coats and the thickness, and a clear count will let you order once and work without stopping. Measure the wall, take off the openings, work out the bags from the coverage figures, count the sand from the mix ratio and the water from the mixing figures, and add a spare bag for waste. Adaptavate Breathaplasta Smooth leads the work for its smooth skim finish, with Ty-Mawr TopLime Hemp Plaster and Kerakoll Biocalce Intonaco as strong partners where the wall needs a light base coat or a certified body coat, and washed sharp sand to give every mix its body. Check the wall with water and tape, lay thin coats days apart, and keep a note of what each section used so the next section can be laid thinner. Done this way, the render will read as part of the old wall, and the wall will stay vapour open and sound for years.
Related guides
More ways to save on your next finish
Programs that pair well with the guide above. Offers and eligibility are set by Amazon and may change.
A free business account with business pricing and bulk-buying tools for work, shop or home office.
Create a business accountFast, free shipping on eligible items, plus Prime Video and more. Eligible new members can start with a free trial.
Start a Prime free trialRead from a huge library of eBooks, including how-to guides and cookbooks. Eligible new members can start with a free trial.
Try Kindle UnlimitedAudiobooks and podcasts for the commute, the garage or the kitchen. Eligible new members can start with a free trial.
Try Audible freeAs an Amazon Associate we earn from qualifying purchases. Using these links costs you nothing extra.
Write Your Review
No reviews yet. Be the first to share your experience!