Key takeaways
- How long a sponge float lime render finish takes around repaired old brick arches, coat by coat, from repair curing to drying, full carbonation and decoration.
As an Amazon Associate I earn from qualifying purchases. This post may contain affiliate links at no extra cost to you.
Lime render runs on a slow clock, and an old brick arch runs slower than a flat wall. How long does it take to finish lime render with a sponge float around repaired old brick arches is a question with two answers: the working time is a few days, and the full curing time is months. The render can be applied, floated, and left looking finished within a week or two of work, but the lime keeps hardening by carbonation for 3 to 6 months afterwards, and decoration should wait until the render has dried through.
The arch adds time at every stage. Repairs to the brickwork need 1 to 2 days to cure before plastering starts. Dubbing out coats need 5 days or more to dry. Each render coat needs days of curing before the next goes on, and the curve of the arch means each coat is worked in short sections, which slows the floating. This guide lays out the timeline coat by coat, with the waiting times from trade guides and maker data sheets that have been opened and read, so the job can be planned honestly from the first day to the last.
Quick answer
Finishing lime render with a sponge float around repaired old brick arches takes about 3 to 4 weeks of elapsed time for a three coat system in decent conditions, plus 3 to 6 months of carbonation before the render reaches full hardness. The working days are far fewer: repairs harden for 1 to 2 days, dubbing out dries for 5 days or more, the scratch coat hardens for a minimum of 5 to 7 days, the float coat hardens for 7 to 14 days, and the finish coat is surface dry within 2 to 5 days. A useful rule of thumb is 1 day per millimetre of coat thickness before the next coat goes on, so a 10 mm scratch coat wants 10 days and a 10 mm float coat wants 10 days.
The finish coat itself is quick. Once the float coat has cured, the finish coat goes on in a morning, the sponge float pass follows the same day once the coat has firmed slightly, and the surface is dry to the touch within a few days. What takes the time is the waiting between coats, and that waiting cannot be shortened without weakening the render.
| Stage | Waiting time | What happens next |
|---|---|---|
| Brick repairs | 1 to 2 days to cure | Dubbing out or scratch coat |
| Dubbing out coat | 5 days or more to dry | Key after about 10 hours, then scratch coat |
| Scratch coat | 5 to 7 days minimum | Float coat, or 10 days by the 1 day per mm rule |
| Float coat | 7 to 14 days minimum | Finish coat, or 10 days by the 1 day per mm rule |
| Finish coat | 2 to 5 days surface dry | Mist daily for a week, then leave to carbonate |
| Carbonation | 3 to 6 months | Full hardness, breathable decoration after 4 weeks |
| Paint or coating | 6 months for water repellent | Limewash can go on while the plaster is still green |
Step by step
Day 1 to 2: let the brick repairs cure
The clock starts before any render is mixed. Repairs to the brickwork should be allowed to cure for 1 to 2 days before plastering starts, and that waiting time is part of the job. Fresh repair mortar is still shrinking and still full of water, and rendering over it traps that movement in the new coat, so the finish cracks along the line of the repair.
Use these two days well. Survey the arch, measure the area, order the materials, and set up the scaffold with hessian sheeting. Check the weather forecast for the next three weeks, because lime render should not go on below 5 degrees Celsius or above 30 degrees, and fresh render needs protection from frost for the first 48 hours. A job started in a cold snap will lose more days to frost protection than it gains by starting early.
Day 2 to 7: dub out the hollows
Heavily defaced surfaces and areas with a lot of damaged joints need a dubbing out coat to even out the surface before the render coats go on. Fill deep voids and dub out hollows with a stiff lime mix, kept damp, and apply it by harling where the surface is very uneven. When the dubbing out coat has set enough to hold a scratch, after about 10 hours, key it so the next coat can grip.
Allow enough time for the dubbing out coat to dry before applying any plaster. Site conditions decide the wait, and it could take 5 days or more. A dubbing out coat that is still wet when the scratch coat goes on will shrink and pull away, leaving a hollow patch that shows through the finish. On a shallow arch with sound brick, this stage may take only a day or two, but on a rebuilt arch it is the longest single wait before the render starts.
Day 7 to 8: dampen and apply the scratch coat
Dampen the brickwork the evening before application with clean water, using a brush or a fine spray, and repeat the dampening one hour before the scratch coat goes on. The wall should be damp to the touch but not saturated, because dry brick draws water out of the fresh mortar too fast and leaves a weak, powdery layer.
Mix the scratch coat at 1 part NHL 3.5 to 3 parts sharp sand by volume, and mix for at least 5 minutes in a forced action mixer. Apply the scratch coat 10 to 12 mm thick, pressing firmly onto the damp brick with upward strokes, working from the bottom of the arch upward. While the render is still soft, within 2 to 4 hours, scratch horizontal lines about 5 mm deep across the whole surface with a devil float or a comb. The scratching itself takes an hour on a small arch, and it is the last working step before the first long wait.
Day 8 to 15: cure the scratch coat
Leave the scratch coat to cure for a minimum of 5 to 7 days before the float coat goes on. Lime render hardens by carbonation, reacting with carbon dioxide in the air, and not simply by drying, so slow curing produces stronger render. The widely used rule of thumb is 1 day per millimetre of coat thickness before the next coat, so a 10 mm scratch coat wants 10 days in reasonable conditions, and a 12 mm coat wants 12 days.
Protect the fresh render from frost for the first 48 hours with hessian or breathable sheeting, and never use impermeable plastic, which traps moisture and blocks carbonation. In hot, dry, or windy weather, mist the render with water once or twice daily for the first 3 days. In temperatures above 10 degrees with no risk of frost, hessian sheeting should be sprayed regularly with water to raise humidity and control moisture loss, a practice known in the trade as cherishing, recommended for at least 5 days per coat. The render should feel firm to the touch before the next coat goes on.
Day 15 to 16: apply the float coat
Dampen the scratch coat surface one hour before application, then mix the float coat at 1 part NHL 3.5 to 2.5 parts sharp sand by volume. Apply the float coat 8 to 10 mm thick with a steel trowel to key it in, then level it with a wood float, which gives a flatter surface than steel and follows the curve of the arch without leaving hard trowel lines. The float coat should bring the total thickness to about 20 mm.
The float coat application takes a day on a small arch, including the levelling and the closing of any shrinkage cracks from the scratch coat. Do not apply excessively thick coats, because they increase the risk of slumping and cracking, and the curve of an arch makes a thick coat harder to hold in place.
Day 16 to 30: cure the float coat
Leave the float coat to cure for 7 to 14 days minimum, with longer curing giving better strength. By the 1 day per millimetre rule, a 10 mm float coat wants 10 days, and a coat applied in cold or damp conditions wants longer. Below about 8 degrees everything slows, and below 5 degrees work should stop, so a float coat applied in late autumn can take three weeks or more before it is ready for the finish.
Mist daily in hot weather, and keep the hessian in place until the surface is hard to the touch. The float coat should be firm and dry on the surface before the finish coat goes on, and the colour should have lightened evenly across the arch. Dark patches mean damp spots, and a damp spot should be given more time rather than covered with a finish coat that will trap the moisture.
Day 30 to 31: apply the finish coat and sponge float it
Dampen the float coat, then mix the finish coat at 1 part NHL 3.5 to 2.5 parts fine aggregate by volume and apply it 5 to 8 mm thick. Total system thickness should be 25 to 30 mm across the three coats. The finish coat application takes a morning on a small arch, and the sponge float pass follows the same day, once the coat has firmed slightly.
Work the finish with a damp sponge float in small circular movements, rinsing often and keeping the pressure light and even. A low absorbency float is the right choice, because a standard sponge pulls too much water from the surface and can dry the coat out ahead of the final pass. Work the curve of the arch in short sections so the texture stays consistent from one side to the other, and finish the whole arch in one session so the texture does not change halfway across.
Day 31 to 38: surface drying and first week care
The finish coat is surface dry within 2 to 5 days, depending on thickness, background suction, and room conditions. A 5 mm finish coat dries faster than an 8 mm coat, and a coat on a thirsty brick arch dries faster than the same coat on dense stone. Mist daily for the first week in dry weather, and keep the hessian in place until the surface has firmed.
Protect the finish coat from frost for 48 hours, and keep rain off it for the first 24 hours if possible. Light rain after the initial set does little harm, because lime render is porous, but heavy rain can wash out the surface before it firms. After the first week, the render looks finished, but it is still soft inside, and the carbonation clock is only just starting.
Month 2 to 6: carbonation and decoration
Full carbonation takes 3 to 6 months, during which the render gradually hardens and gains strength. Hydraulic lime plaster hardens in around 90 days, which means it can be painted with a breathable coating much sooner than non hydraulic lime plaster, which typically takes around 12 months to cure fully. The render keeps hardening for years afterwards as carbonation works inwards from the surface, and it needs some moisture present to happen, so the wall should not be dried out aggressively.
Breathable paints such as clay or mineral paints typically wait around 4 weeks or more, once the plaster has dried through and the surface is well into carbonation. Water repellent coatings should wait at least 6 months, because lime render needs to breathe while it carbonates. Limewash is the exception: it can go onto fresh lime almost straight away, and traditional practice often puts the first coat on while the plaster is still green, since it carbonates along with the wall.
Tools and materials
AURO Keratherm Fine No. 348-16
AURO Keratherm Fine No. 348-16 is a natural white fine plaster based on finest white lime, with a grain size of 0.5 mm and a layer thickness of 0.9 to 2 mm per layer. The maker data sheet lists a drying time of about 24 hours per 1 mm of layer thickness at 20 degrees Celsius and 60 percent relative humidity, and a consumption rate of about 0.9 kg per square metre for a 1 mm layer. Final strength is obtained after several weeks, and high air humidity favours carbonation.
The data sheet also lists a curing time of about 4 weeks before coloured paint coats, and asks for new lime plaster to be left uncoated to dry for at least 4 weeks. For a finish coat on an arch, the 24 hour per millimetre figure is the useful one: a 2 mm skim needs about 2 days before it can be worked further, and a thicker build needs proportionally longer. The plaster can be textured with a trowel, a brush, or a sponge board after application.
- Grain size: 0.5 mm
- Layer thickness: 0.9 to 2 mm per layer
- Drying: about 24 hours per 1 mm at 20 degrees and 60 percent humidity
- Consumption: about 0.9 kg per square metre per 1 mm
Pros: Clear drying figure per millimetre, fine grain suits thin finishes, long working data.
Cons: Thin layers only, needs 4 weeks before paint, drying slows in cold or damp air.
Refina Hydro Sponge Float 228734
The Refina hydro sponge float, reference 228734, is a cellular sponge float sized 280 by 140 mm with a 30 mm hydro open cell yellow sponge. The maker catalogue describes the hydro sponge as an open cell float for floating render materials, with a deep pad that holds water well and releases it slowly across the surface. The 30 mm depth is the deepest in the Refina sponge float range, and it suits long floating sessions on a large arch.
On a brick arch, the deep pad is useful because the float needs to stay damp across a curved surface without constant rewetting. A shallow pad dries out halfway across the arch and starts dragging, while the hydro pad keeps working. Rinse it in clean water between passes and wring it lightly, because a pad that is too wet pulls material off the finish coat.
- Size: 280 by 140 mm, 11 by 5.5 in
- Sponge: 30 mm hydro open cell, yellow
- Use: floating render materials, long sessions
- Reference: 228734
Pros: Deep pad holds water, suits long floating sessions, open cell releases water evenly.
Cons: Heavy when wet, needs frequent rinsing, too deep for very thin finish coats.
Marshalltown MXS13D Plasterers Finishing Trowel 13 by 5 in
The Marshalltown MXS13D is a plasterers finishing trowel sized 300 by 125 mm, 13 by 5 in, with a flexible high grade spring steel blade, an aluminium alloy mounting, and a curved DuraSoft handle held by a nut and washer. The maker listing describes the blade as tempered, ground, and polished, fastened to the mounting with ten hard steel rivets, and the mounting as very light but as strong as steel.
The trowel is the tool for applying the float coat and for the first pass on the finish coat before the sponge float comes out. The flexible blade follows the curve of an arch better than a stiff blade, and the DuraSoft handle reduces hand fatigue on a long day. Keep the blade clean and dry between uses, because lime left on the blade will pit the steel.
- Size: 300 by 125 mm, 13 by 5 in
- Blade: flexible spring steel, tempered and polished
- Mounting: aluminium alloy, ten steel rivets
- Handle: curved DuraSoft grip
Pros: Flexible blade follows curves, light mounting, comfortable handle for long sessions.
Cons: Blade needs cleaning after lime work, flexible blade takes practice, not for rough base coats.
St Astier NHL 2 natural hydraulic lime
St Astier NHL 2 is a pure natural hydraulic lime of the weakest hydraulic class, and it is the right binder where the brick is very soft and the arch is sheltered. The maker range lists NHL 2 for the softest work, NHL 3.5 for moderately exposed exterior work, and NHL 5 for highly exposed or below ground work. A weaker lime moves with soft brick instead of fighting it, and that matters on an old arch where the brick is softer than the mortar around it.
NHL 2 sets more slowly than NHL 3.5 and needs more time between coats, because the hydraulic set is weaker and carbonation does more of the work. Allow the same 1 day per millimetre rule as a minimum, and add extra days in cold or damp weather. The lime is supplied in 25 kg bags and should be kept dry in storage.
- Strength class: NHL 2 to EN 459
- Use: very soft brick, sheltered arches, delicate masonry
- Setting: slower than NHL 3.5, more reliant on carbonation
Pros: Softest hydraulic lime, kind to old brick, moves with the wall.
Cons: Slow to gain strength, not for exposed or damp work, needs longer curing.
Damp hessian sheeting
Damp hessian sheeting is the protection for fresh lime render on an arch, and it is listed in every trade guide for this work. Hessian is a breathable membrane, so it shades the render from sun and wind without trapping moisture, and in temperatures above 10 degrees with no risk of frost, the sheeting should be sprayed regularly with water to raise humidity and control moisture loss. The trade calls this cherishing, and it is recommended for at least 5 days per coat.
Fix the hessian to the scaffold so it hangs clear of the fresh render, with an air gap between the sheet and the wall. Hessian that touches the wet render will stick to it and mark the surface. Keep a sprayer nearby and mist the hessian once or twice a day in hot weather, and keep it in place for the first week after each coat.
- Material: woven hessian, breathable
- Use: shade and moisture control for fresh render
- Cherishing: mist regularly, at least 5 days per coat
Pros: Breathable, cheap, reusable, controls drying better than plastic.
Cons: Must hang clear of the render, needs regular misting, rots if left wet in storage.
Limewash
Limewash is lime in water, and it is the decoration that can go onto fresh lime render almost straight away. The trade guide lists limewash as one of the recommended breathable coatings for lime plaster, alongside clay paint and hydraulic lime wash, and notes that standard paints and emulsions must be avoided because they compromise vapour permeability and lock moisture into the wall.
A limewash recipe from a French ochre maker lists colouring the lime with pigment, adding about 100 grams of admixture per kilogram of lime, and diluting 1 volume of preparation with about half to 1 volume of water to get a paste ready to spread. The wash is applied from the bottom upward with a float, then floated with a damp sponge in small circular movements. Because limewash is lime in water, it carbonates along with the wall, so the timing is far more forgiving than for a breathable paint, which should wait around 4 weeks or more.
- Form: lime in water, often with mineral pigment
- Application: brush or float, from the bottom upward
- Timing: can go on while the plaster is still green
- Finish: breathable, carbonates with the wall
Pros: Goes on fresh render, breathable, traditional finish for arches.
Cons: Colour lightens as it dries, needs several coats, must be kept stirred.
Common mistakes
Rushing the coats
Each coat needs time to cure before the next goes on, and the waiting time cannot be shortened by working faster. The scratch coat needs a minimum of 5 to 7 days, the float coat 7 to 14 days, and the finish coat several days of surface drying. Rushing the sequence produces weak render that de-bonds or cracks, and the repair costs more than the waiting time saved.
Force drying with heaters
Never force dry lime render with heaters. Heat dries the surface faster than the body of the coat, and the surface shrinks, crazes, and loses strength. Lime render hardens by carbonation, which needs moisture present, so rapid drying stops the hardening instead of speeding it up. Shade the work, mist it, and let it dry slowly.
Floating the finish at the wrong moment
A sponge float works when the finish coat has firmed slightly, not while it still drags and not after it has stiffened. Floating too early tears the surface and pulls aggregate out of the coat. Floating too late does nothing, because the surface has already set. Judge the moment by touch, and work the arch in short sections so the whole curve is floated at the same stage.
Painting before the render has dried through
Breathable paints should wait around 4 weeks or more, and water repellent coatings should wait at least 6 months. Painting too early traps moisture in the render and the paint peels, while the render underneath stays soft. Limewash is the exception and can go on while the plaster is still green, because it carbonates along with the wall.
Working in frost or high heat
Lime render should not go on below 5 degrees Celsius or above 30 degrees. Frost damages fresh render and the damage cannot be undone, while extreme heat causes rapid surface drying and weak curing. Plan the work for spring to early autumn, and protect fresh render from frost for the first 48 hours.
FAQ
How long does a three coat lime render take on a brick arch?
About 3 to 4 weeks of elapsed time in decent conditions: repairs harden for 1 to 2 days, dubbing out dries for 5 days or more, the scratch coat hardens for 5 to 7 days, the float coat hardens for 7 to 14 days, and the finish coat is surface dry within 2 to 5 days. Full carbonation takes 3 to 6 months after that.
What is the 1 day per millimetre rule?
Allow roughly 1 day per millimetre of coat thickness before applying the next coat, so a 10 mm scratch coat wants about 10 days and a 10 mm float coat wants about 10 days. In cold, damp, or still conditions, extend those times substantially, and never go below 4 to 5 days for any coat.
When can the arch be limewashed?
Almost straight away. Limewash is lime in water, so it bonds happily to fresh plaster, and traditional practice often puts the first coat on while the plaster is still green. It carbonates along with the wall, so the timing is far more forgiving than for a breathable paint.
When can breathable paint go on?
Around 4 weeks or more after the finish coat, once the plaster has dried through and the surface is well into carbonation. Water repellent coatings should wait at least 6 months. The exact wait depends on the weather, the thickness of the coats, and the suction of the brickwork.
Does cold weather change the timeline?
Yes, a lot. Below about 8 degrees everything slows, and below 5 degrees work should stop. A float coat applied in late autumn can take three weeks or more before it is ready for the finish, and frost protection for the first 48 hours is essential. Plan the work for spring to early autumn where possible.
Conclusion
Finishing lime render with a sponge float around repaired old brick arches takes about 3 to 4 weeks of elapsed time for a three coat system, and 3 to 6 months for the render to carbonate fully. The working days are few: a day to apply each coat and float the finish, and the rest of the time is waiting. Repairs cure for 1 to 2 days, dubbing out dries for 5 days or more, the scratch coat hardens for 5 to 7 days, the float coat for 7 to 14 days, and the finish coat is surface dry within 2 to 5 days. The 1 day per millimetre rule is the simplest way to plan those waits, and cold weather extends every one of them.
The arch rewards a slow schedule. Dampen the brickwork, keep the fresh render shaded and damp under hessian, mist it in hot weather, and let each coat firm before the next goes on. Limewash can go on while the plaster is still green, breathable paint waits around 4 weeks, and water repellent coatings wait 6 months. Planned that way, the sponge float finish follows the curve of the arch and keeps hardening for months after the scaffold comes down.
Related guides
More ways to save on your next finish
Programs that pair well with the guide above. Offers and eligibility are set by Amazon and may change.
A free business account with business pricing and bulk-buying tools for work, shop or home office.
Create a business accountFast, free shipping on eligible items, plus Prime Video and more. Eligible new members can start with a free trial.
Start a Prime free trialRead from a huge library of eBooks, including how-to guides and cookbooks. Eligible new members can start with a free trial.
Try Kindle UnlimitedAudiobooks and podcasts for the commute, the garage or the kitchen. Eligible new members can start with a free trial.
Try Audible freeAs an Amazon Associate we earn from qualifying purchases. Using these links costs you nothing extra.
Write Your Review
No reviews yet. Be the first to share your experience!