Key takeaways
- Find how long lime render takes over old masonry repairs, from cleaning and pointing to base coats, drying days and the finish that needs time to carbonate.
As an Amazon Associate I earn from qualifying purchases. This post may contain affiliate links at no extra cost to you.
A lime render over old masonry repairs is a slow job, and the time it takes is decided by the drying days between the coats, not by the hours spent with the trowel. A wall that is sound and flat can be rendered in a few working days spread over two or three weeks, while a wall with hollow joints, soft brick and a poor base needs pointing, dubbing out and three coats, and the calendar grows with every extra stage. how long does it take to apply lime render over compatible old masonry repairs is a question about the calendar, because a plan that counts only the working days will stall between coats and finish late.
The first thing to work out is the condition of the wall. Walk it in raking light and mark every loose joint, hollow patch and soft area, and note how deep the repairs are, because a wall with many deep repairs needs more days for the pointing and the dubbing out than a wall that is sound. Check the weather too, because lime render dries slowly in cold and damp weather, and a job planned for a wet week will take twice as long as the same job planned for a dry week. Write the stages down in order, and allow a day for each stage plus the drying days between them, because the drying days are part of the job, not a delay in it.
This guide works through the time in the order it falls, from the cleaning and the pointing to the base coats, the drying days and the finish that needs time to carbonate. Each entry gives the verified facts that matter for planning, and the steps show how the work fits together on a real wall. There are no money figures here, because the price of labour moves with the place and the season, but the time is the same everywhere, and a clear count of the days will let you plan the job for your own wall.
Tools and materials
Ty-Mawr TopLime Superfine Finish Plaster
- Superior fine and superfine internal and external plaster non hydraulic
- Used on top of base and float coats
- Blend 50:50 with hemp plaster for smooth finish
Ty-Mawr TopLime Superfine Finish Plaster is the lead material for this job because it is a superior fine and superfine plaster, non hydraulic, that goes on top of the base and float coats and gives the wall a soft, even finish. Used on top of base and float coats, it is the last coat the wall sees, and the time it takes to lay on and to dry decides the end of the job. Blend it 50:50 with hemp plaster for a smooth finish, and lay it on in thin, even passes so it dries evenly across the whole wall. A finish laid too thick will crack as it dries, while a thin, well laid finish will dry to a soft, even face. Count the finish bags from the wall area and the skim thickness, and keep the finish bags separate from the base coat bags so they are not mixed up on site.
Mike Wye Lime Putty
- High calcium lime putty slaked and matured for a minimum of three months
- Sand 0 to 1 mm; lime to BS EN 459-1
- 99.99 per cent finer than 0.18 mm particle size
Mike Wye Lime Putty is the repair material for this job, and it matters because every hole, soft joint and missing piece of mortar in the old repairs must be made good with lime before any render goes on, and the putty needs days to carbonate before the render can go over it. A high calcium lime putty slaked and matured for a minimum of three months is fatty and smooth, so it spreads cleanly and holds its shape on a trowel, and it sets only by taking in carbon dioxide from the air, which keeps the repair vapour open in the same way as the wall around it. Use it to fill small holes and to re-point shallow joints where the old mortar has fallen away, then leave the repair to firm up and carbonate before rendering over it. A repair that is still soft will show through the render as a dark patch, so patience here saves a second coat later. The putty stage adds days to the calendar, and those days cannot be skipped.
Saint-Astier NHL 3.5
- 100 percent natural hydraulic lime to EN 459
- Compressive strength 3.5 to 15 MPa at 28 days, typical 7 MPa
- Bulk density 0.65 kg per litre; free lime above 28 percent
- 25 kg bag
Saint-Astier NHL 3.5 is the lime for the render coats on the more exposed faces of the wall, where the render needs a firmer set than a soft lime can give, and the set time decides how soon the next coat can go on. Its strength range of 3.5 to 15 MPa at 28 days, with a typical value of 7 MPa, gives the render a firm finish, while the free lime above 28 percent keeps the render vapour open, which is what an old wall needs. The bulk density of 0.65 kg per litre helps you work out how much lime a mix will take, and the 25 kg bag is easy to handle and store on a small site. Mix each bag with clean water as the maker directs, keep the bags dry in storage, and lay the coat on in even passes so the render sits flat across the whole surface. A hydraulic lime sets faster than a putty lime, so it shortens the drying days between coats, but it still needs days, not hours, before the next coat goes on.
Kerakoll Biocalce Intonaco Fino
- Plaster based on NHL 3.5 natural hydraulic lime, finer grade body coat
- Consumption about 1.2 kg per square metre per mm of thickness
- 25 kg bags; mixing about 5.1 litres per 25 kg bag
- Application temperature plus 5 C to plus 35 C
Kerakoll Biocalce Intonaco Fino earns its place as the finer grade body coat where the old masonry repairs have left a wall that is sound but uneven, and the render needs a smooth body coat that will take the finish without a visible line. Its base of NHL 3.5 natural hydraulic lime gives it a steady set and a firm finish, while the consumption guide of about 1.2 kg per square metre per mm of thickness makes it easy to work out how much to order for a wall of a known area. The finer grade fills small hollows in the old work and gives a soft plaster character that reads well on a traditional wall. Mix each bag with about 5.1 litres of clean water, keep the application temperature between plus 5 C and plus 35 C, and lay the coat on in even passes. Let the coat firm up for days before the finish goes on, because a body coat that is still soft will show through the finish as a dark patch.
Chopped horsehair
- Natural fibre reinforcement for base coat lime plaster
- About 2 to 3 kg per cubic metre of mix
Chopped horsehair is the fibre that keeps a base coat of lime render from shrinking and cracking as it dries over old masonry repairs, and the time it saves is the time a cracked coat would take to strip and redo. Short fibres spread through the mix give the fresh render a network of tiny ties that hold it together while the lime carbonates, and they are most useful where the render has to bridge a change in the wall, such as the line between an old brick repair and the stone around it. Add the hair at about 2 to 3 kg per cubic metre of mix, and tease the strands apart as you add them so they spread evenly instead of clumping into balls. A mix with the hair well spread will trowel on smoothly and hold its shape on the wall, while a mix with the hair in clumps will drag under the trowel and leave lines. Keep the hair dry in storage, and mix it in before the final water so every strand is coated with lime.
Cornish Lime Mature Lime Putty
- High calcium lime putty matured for a minimum of four months
- Approximate bulk density 1350 kg per cubic metre
- Available in 10 kg and 25 kg tubs and bulk bags
- Carbonation 1 to 1.5 mm per month
Cornish Lime Mature Lime Putty is the second putty for this job, and it matters because the carbonation rate of 1 to 1.5 mm per month shows how slowly a lime putty sets, and how long the job will take from the first repair to the last coat. A high calcium lime putty matured for a minimum of four months is fatty and smooth, so it spreads cleanly and holds its shape on a trowel, and it sets only by taking in carbon dioxide from the air. Use it to fill the deeper holes and to re-point the wider joints where the old mortar has fallen away, then leave the repair to firm up and carbonate before rendering over it. The bulk density of about 1350 kg per cubic metre helps you work out how much putty a repair will take, and the 10 kg and 25 kg tubs let you buy the amount the job needs. A repair that is still soft will show through the render, so the putty stage adds days to the calendar that cannot be skipped.
| Item | Key spec | Best for |
|---|---|---|
| Ty-Mawr TopLime Superfine Finish Plaster | Superfine non hydraulic plaster; blend 50:50 | Smooth finish over base coats |
| Mike Wye Lime Putty | Matured three months; 99.99 per cent fine | Filling holes and re-pointing |
| Saint-Astier NHL 3.5 | Strength 3.5 to 15 MPa at 28 days | Firmer render on exposed faces |
| Kerakoll Biocalce Intonaco Fino | NHL 3.5; about 1.2 kg per sq m per mm | Finer grade body coat |
| Chopped horsehair | About 2 to 3 kg per cubic metre | Reinforcing base coats |
| Cornish Lime Mature Lime Putty | Matured four months; carbonation 1 to 1.5 mm per month | Deeper repairs and wide joints |
Step by step
Step 1: Check the wall and count the stages
Walk the wall in raking light and mark every loose joint, hollow patch and soft area with a pencil. Tap the surface with a knuckle and listen for a hollow note that shows the old render or mortar has lost its bond. Count the stages the job will need, and write them down in order: cleaning, pointing, dubbing out, base coat, body coat and finish. A wall that is sound needs fewer stages than a wall with many repairs, and the calendar grows with every extra stage. Drip water on several spots and note which areas darken and absorb and which stay pale. This check decides the time the job will take, because a wall that passes it can be rendered in a few working days spread over two or three weeks, while a wall that fails it needs weeks of repair before the render goes on.
Step 2: Clean the wall and rake out the joints
Brush the whole wall down with a stiff brush to take off loose dust, moss and flaking mortar, working from the top down so the dirt falls clear of the cleaned work. Wash the wall with clean water and a brush, and let it dry before you look at it again, because a wet wall hides the faults. Rake out the loose and hollow joints with a joint raker, cutting back to sound mortar and leaving a square, even joint that the new pointing can grip. Cleaning and raking takes a day on a long wall, and the wall needs a day to dry before the pointing goes on. Do not rush this stage, because a render laid on a dirty wall will not bond, and the time saved by rushing will be lost many times over when the render fails.
Step 3: Point the joints and let them carbonate
Mix the lime putty to a workable consistency and press it into the joints with a small trowel, working it firmly into the depth of the joint rather than skimming over the top. Fill the joints in two thin passes rather than one deep one, and smooth the surface with a damp brush so the pointing sits flush with the brick and stone faces. Leave the pointing to firm up and carbonate before any render goes on, because a joint that is still soft will show through the render as a dark line. Small joints usually need a day, and deeper ones need longer, and the carbonation rate of about 1 to 1.5 mm per month shows how slowly a lime putty sets. Keep the pointing damp in hot weather so it does not dry out before it has set, and protect it from rain and frost while it firms up.
Step 4: Dub out the hollows and let them firm up
Mix the lime putty plaster and press it into the hollows between the bricks and stones, building the wall up in layers until it reads true enough for the render. Lay on a scratch coat first, key it while it is still green, and let it firm up before the float coat goes on. Use a straight edge to check the plane as you work, and dub out again where the light shows a hollow. A dubbing out coat that is still soft will show through the render as a dark patch, so let each layer firm up in its own time. Dubbing out takes a day to lay on and several days to dry, and the drying days are part of the job. Keep the work damp in hot weather, and protect it from rain and frost while it sets.
Step 5: Prime the patchy areas and dampen the wall
Brush the primer over every area where the old work has worn thin, every new putty repair, and every patch of bare masonry, working it evenly with a brush and keeping a wet edge. Let the primer dry fully as the maker directs before any render goes on. Then mist the wall lightly with clean water until the surface darkens evenly, and wait until the shine leaves the face. A wall that is too dry will suck the water out of the fresh render in minutes and leave a powdery coat, while a wall that is wet will dilute the render and leave it weak. The priming and the damping take an hour, but they decide whether the render bonds, and a render that does not bond will need to be stripped and redone at full cost in time and material.
Step 6: Lay on the base and body coats and let them dry
Load the trowel and press the base coat firmly onto the dampened wall, working it into the joints and the hollows so it keys into the surface rather than lying on top of it. Work from a corner across the wall in planned sections, keeping a wet edge at all times, and do not go back over a section that has started to firm up. Lay the coat on at an even thickness, and scratch a key into the surface while it is still green, so the next coat has something to grip. Once the coat has firmed up, float it with a wooden float in broad sweeps until the surface reads flat. Leave the coat alone after floating and let it firm up in its own time. Lime render needs days, not hours, between coats, and more in cold or damp weather. A hydraulic lime sets faster than a putty lime, but it still needs days before the next coat goes on.
Step 7: Apply the finishing coat and let it carbonate
Dampen the wall lightly again, then lay on the finishing coat in the same even passes, working a little faster and looser than the base coat. Keep the pressure light and let the trowel do the work, and do not overload the trowel near the edges of the work. Where the new work meets an area of old masonry that is not being rendered, feather the edge with a damp sponge so the line disappears instead of drying as a hard ridge. Float the finishing coat once it has firmed up, closing the surface to a soft, even finish. Step back often and look at the wall as a whole rather than at the trowel, because a render succeeds when the wall reads as one surface. Protect the fresh work from rain, frost and strong sun for several days while it carbonates, and do not judge the colour until the coat has dried fully in daylight, because lime render lightens for days after it goes on.
Common mistakes
Counting only the working days and forgetting the drying days
A plan that counts only the days with the trowel in hand will finish late, because lime render needs days between coats and the drying days are part of the job. Always allow the drying days in the plan, and use them to clean tools, order the next material and check the wall in raking light. The drying days are part of the job, not a delay in it.
Rendering over a repair that is still soft
A render laid over a putty repair that is still soft will dry darker than the wall around it, and the repair will show through the finish as a dark patch. Always let the pointing and the dubbing out firm up and carbonate before the render goes on, and allow a day for small repairs and longer for deeper ones. The putty stage adds days to the calendar that cannot be skipped.
Laying the finishing coat too soon
A finishing coat laid over a base coat that is still soft will drag, lift and crack, and the two coats will dry as one uneven layer instead of two even ones. Lime render needs days between coats, and more in cold or damp weather. Wait until the base coat is firm to the touch and pale in colour before starting the finish.
Working the render after it has started to firm up
Lime render sets slowly, but going back over a half firm section with a loaded trowel lifts the render and leaves a pale scar that no amount of later work will hide. Plan the sections before you start, keep a wet edge, and leave each section alone once it is done. If a section goes wrong, let it dry fully and correct it with the next coat.
Using a coat that is too thick
A thick coat of lime render looks generous in the bucket and generous on the wall, but it shrinks as it dries and cracks into a fine map of lines across the surface. Thin coats bond better, dry more evenly, and build to a stronger finish. Two thin coats will always outlast one thick one on an old wall.
Judging the colour before the coat has dried
Lime render is darker when wet than when dry, and it keeps lightening for days after application. Judge the colour only after the coat has dried fully in daylight. If the dried coat is still darker than the old wall, the difference is usually in the mix or the water ratio, so keep the mix the same for every batch.
FAQ
How long does lime render take from start to finish?
A sound wall takes a few working days spread over two or three weeks, because each coat needs days to dry before the next goes on. A wall with many repairs takes longer, because the pointing and the dubbing out each need days to firm up and carbonate. Count the stages, allow the drying days between them, and the calendar will follow from the stages.
How long should I wait between coats of lime render?
Allow several days between coats, and longer in cold or damp weather. Lime render firms up slowly as it carbonates, so the base coat must be firm before you can judge its plane and coverage, and a finishing coat laid over a soft base coat will drag and crack. One coat per drying period is the safe rule for most walls.
How long does a lime putty repair need before I can render over it?
Allow at least a day for small repairs, and longer for deeper ones. Lime putty carbonates at about 1 to 1.5 mm per month, so a deep repair needs weeks to carbonate fully, but it only needs to be firm to the touch before the render goes on. Keep the repair damp in hot weather so it does not dry out before it has set.
Why does lime render take longer than cement render?
Lime render sets by carbonation, taking in carbon dioxide from the air over days and weeks, while cement render sets by a chemical reaction that finishes in hours. The slow set is what makes lime render vapour open and flexible, so it moves with the old wall instead of cracking. The extra days are the price of a render that will last for years.
Can I speed up the drying with heaters or fans?
No. Heaters and fans will dry the surface too fast, and the render will crack and lose its bond to the wall. Let the render dry in its own time, protect it from rain, frost and strong sun, and allow the drying days in the plan. A coat that dries slowly will be stronger than a coat that is forced dry.
What should I do about a hard line where the new render stops?
Feather the edge while the render is still workable, using a damp sponge in light circular motions to soften the line where the new coat meets the old work. If the line has already dried, let the coat dry fully, then soften the edge with a damp sponge and touch it in with a thin coat, blending outward so the repair fades into the old work.
Conclusion
The time lime render takes over old masonry repairs follows from the stages, and a plan that counts the drying days will finish on time. Clean the wall, point the joints, dub out the hollows, lay the base and body coats, and finish with a thin, even coat, allowing days between each stage for the lime to firm up and carbonate. Ty-Mawr TopLime Superfine Finish Plaster leads the work for its smooth finish over the base coats, with Mike Wye and Cornish Lime putties as strong partners where the wall needs repair, and Saint-Astier NHL 3.5 and Kerakoll Intonaco Fino where the wall needs a firmer set. Check the wall with water and tape, prime where it is weak, lay thin coats days apart, and let the colour settle before you judge it. Done this way, the render will read as part of the old wall, and the wall will stay vapour open and sound for years.
Related guides
More ways to save on your next finish
Programs that pair well with the guide above. Offers and eligibility are set by Amazon and may change.
A free business account with business pricing and bulk-buying tools for work, shop or home office.
Create a business accountFast, free shipping on eligible items, plus Prime Video and more. Eligible new members can start with a free trial.
Start a Prime free trialRead from a huge library of eBooks, including how-to guides and cookbooks. Eligible new members can start with a free trial.
Try Kindle UnlimitedAudiobooks and podcasts for the commute, the garage or the kitchen. Eligible new members can start with a free trial.
Try Audible freeAs an Amazon Associate we earn from qualifying purchases. Using these links costs you nothing extra.
Write Your Review
No reviews yet. Be the first to share your experience!